BR100 Increased By (0.44%)
BR30 Increased By (1.39%)
KSE100 Increased By (0.62%)
KSE30 Increased By (0.61%)
BECO 5.43 Decreased By ▼ -0.06 (-1.09%)
BML 55.69 Decreased By ▼ -1.07 (-1.89%)
BOP 35.38 Increased By ▲ 0.26 (0.74%)
CNERGY 8.20 Increased By ▲ 0.05 (0.61%)
DCL 11.55 Increased By ▲ 0.04 (0.35%)
FCCL 58.36 Increased By ▲ 1.61 (2.84%)
FCSC 5.12 Decreased By ▼ -0.03 (-0.58%)
FFL 17.84 Decreased By ▼ -0.04 (-0.22%)
FNEL 1.25 No Change ▼ 0.00 (0%)
HUMNL 11.07 Decreased By ▼ -0.05 (-0.45%)
KEL 8.75 Increased By ▲ 0.33 (3.92%)
KOSM 6.69 Increased By ▲ 0.11 (1.67%)
MLCF 107.15 Increased By ▲ 3.85 (3.73%)
NBP 201.73 Increased By ▲ 1.55 (0.77%)
PACE 11.30 Increased By ▲ 0.01 (0.09%)
PAEL 44.49 Increased By ▲ 1.02 (2.35%)
PIAHCLA 29.41 Increased By ▲ 1.92 (6.98%)
PIBTL 18.64 Increased By ▲ 0.94 (5.31%)
PPL 247.98 Increased By ▲ 3.66 (1.5%)
PRL 35.29 Decreased By ▼ -0.14 (-0.4%)
PTC 66.14 Increased By ▲ 0.79 (1.21%)
SEARL 95.49 Increased By ▲ 2.17 (2.33%)
SSGC 32.04 Decreased By ▼ -0.90 (-2.73%)
TELE 8.87 Decreased By ▼ -0.04 (-0.45%)
THCCL 66.61 Decreased By ▼ -0.11 (-0.16%)
TPLP 10.57 Decreased By ▼ -0.26 (-2.4%)
TREET 25.30 Increased By ▲ 0.18 (0.72%)
TRG 64.40 Decreased By ▼ -0.50 (-0.77%)
WAVES 10.90 Decreased By ▼ -0.03 (-0.27%)
WTL 1.26 Increased By ▲ 0.01 (0.8%)

ISLAMABAD: The Ministry of Industries and Production (MoI&P) has sought Late Payment Surcharge (LPS) of Rs 1.096 billion, to be paid to Sui Northern Gas Pipelines Limited (SNGPL) against supply of gas to fertilizer plants.

Sharing the details, sources revealed that Ministry of Industries and Production submitted a summary with the proposal that Late Payment Surcharge may be waived off between the period - September 2018 to November 2019.

While considering the summary, ECC of the Cabinet, in its decision of March 17, 2021 directed to resubmit the case after recalculation of actual incurred/financial cost of SNGPL against the Late Payment Surcharge for the period between September 2018 to November 2019, in consultation with the Petroleum Division and submit it for consideration of the ECC.

SNGPL through Petroleum Division has provided the recalculation sheet of actual incurred/financial cost i.e. Rs 1.096 billion. The difference between previous claim, ie, Rs 1.517 billion and current calculation is Rs 421.00 million, which is the amount that has been reduced by SNGPL based on the actual rates charged by the banks on short-term borrowing during the period September, 2018 to November, 2019.

Urea fertilizer plants: Ministry reluctant to supply LNG

The Ministry of Industries and Production has proposed that it may be allowed to pay Rs 1.096 billion LPS payment to SNGPL from the budget allocated for operationalisation of two Fertilizer plants in CFY 2021-22.

“If the requested payment is approved from the allocated budget, then M/o Industries and Production would require more funds for clearing SNGPL bills during the CFY 2021-22,” the sources maintained.

Both Ministry of Finance and Ministry Energy (Petroleum Division) have supported the proposal of making payment to SNGPL through the budgetary allocation of CFY 2021-22.

Copyright Business Recorder, 2021

Comments

Comments are closed for this article.