BR100 Increased By (1.02%)
BR30 Increased By (1.71%)
KSE100 Increased By (0.58%)
KSE30 Increased By (0.65%)
BECO 6.03 Increased By ▲ 0.26 (4.51%)
BML 52.61 Decreased By ▼ -0.39 (-0.74%)
BOP 34.23 Increased By ▲ 0.24 (0.71%)
CNERGY 8.16 Increased By ▲ 0.05 (0.62%)
DCL 12.23 Increased By ▲ 0.03 (0.25%)
FCCL 53.80 Increased By ▲ 0.97 (1.84%)
FCSC 5.24 Increased By ▲ 0.17 (3.35%)
FFL 18.03 Increased By ▲ 0.08 (0.45%)
FNEL 1.30 Increased By ▲ 0.01 (0.78%)
HUMNL 11.00 Increased By ▲ 0.12 (1.1%)
KEL 8.07 Increased By ▲ 0.05 (0.62%)
KOSM 5.39 Decreased By ▼ -0.13 (-2.36%)
MLCF 87.90 Increased By ▲ 1.39 (1.61%)
NBP 186.60 Increased By ▲ 1.44 (0.78%)
PACE 10.75 Increased By ▲ 0.17 (1.61%)
PAEL 39.95 Increased By ▲ 0.53 (1.34%)
PIAHCLA 26.19 Decreased By ▼ -0.03 (-0.11%)
PIBTL 17.32 Increased By ▲ 0.65 (3.9%)
PPL 233.49 Increased By ▲ 5.31 (2.33%)
PRL 34.98 Increased By ▲ 0.30 (0.87%)
PTC 67.71 Increased By ▲ 2.38 (3.64%)
SEARL 90.90 Increased By ▲ 0.77 (0.85%)
SSGC 27.20 Increased By ▲ 0.60 (2.26%)
TELE 8.57 Increased By ▲ 0.29 (3.5%)
THCCL 60.85 Increased By ▲ 2.35 (4.02%)
TPLP 8.78 Increased By ▲ 0.56 (6.81%)
TREET 24.65 Increased By ▲ 0.12 (0.49%)
TRG 71.50 Increased By ▲ 1.79 (2.57%)
WAVES 10.01 Increased By ▲ 0.07 (0.7%)
WTL 1.27 Decreased By ▼ -0.01 (-0.78%)
Pakistan

Chairman NEPRA calls on Sadiq Sanjrani

  • Chairman Senate urged that an effective plan needs to be formulated to provide electricity facilities to the remote areas of Balochistan.
Published April 21, 2021 Updated April 21, 2021 05:08pm
By

ISLAMABAD: Chairman National Electronic Power Regulatory Authority (NEPRA) along with member NEPRA Balochistan Wednesday called on Chairman Senate Muhammad Sadiq Sanjarani here at Parliament House to brief him on power supply in the province.

While exchanging views on the overall energy situation in the province the Chairman Senate said that the power system in Balochistan should be improved further.

In order to give relief to the people of Balochistan in the energy sector, the Chairman Senate directed NEPRA officials to complete the ongoing projects in the province at the earliest.

“Local resources should be utilized to increase the power generation capacity in the province”, he further added. Chairman, during the meeting, also directed the visiting dignitaries to take immediate steps to control load-shedding in the province.

Keeping in view the importance of Gawadar, Sadiq Sanjrani directed Chairman Nepra and member NEPRA ( Balochistan) to complete power supply projects in Gawadar as soon as possible.

Chairman Senate urged that an effective plan needs to be formulated to provide electricity facilities to the remote areas of Balochistan.

He emphasized that reliance on alternative energy sources would reduce load-shedding, therefore it was necessary to take effectual steps to generate clean and cheap electricity from alternative resources. Suitable steps should also be taken for power generation, he stressed.

Comments

Comments are closed for this article.