BR100 Decreased By (-0.4%)
BR30 Decreased By (-0.65%)
KSE100 Decreased By (-0.29%)
KSE30 Decreased By (-0.22%)
AGHA 6.56 Decreased By ▼ -0.11 (-1.65%)
BECO 4.40 Increased By ▲ 0.05 (1.15%)
BML 55.89 Decreased By ▼ -0.28 (-0.5%)
BOP 30.05 Decreased By ▼ -0.07 (-0.23%)
CNERGY 12.75 Decreased By ▼ -0.23 (-1.77%)
CSIL 5.21 Decreased By ▼ -0.10 (-1.88%)
FCCL 51.00 Decreased By ▼ -0.65 (-1.26%)
FFL 14.43 Decreased By ▼ -0.06 (-0.41%)
FNEL 1.22 Increased By ▲ 0.01 (0.83%)
KEL 5.97 Decreased By ▼ -0.09 (-1.49%)
KOSM 5.58 Decreased By ▼ -0.26 (-4.45%)
LOTCHEM 26.15 Decreased By ▼ -0.02 (-0.08%)
MLCF 90.33 Decreased By ▼ -0.90 (-0.99%)
NBP 161.45 Decreased By ▼ -2.74 (-1.67%)
NCPL 52.55 Decreased By ▼ -0.63 (-1.18%)
NPL 57.98 Decreased By ▼ -1.14 (-1.93%)
OGDC 315.40 Increased By ▲ 2.01 (0.64%)
PACE 9.70 Decreased By ▼ -0.07 (-0.72%)
PAEL 34.73 Decreased By ▼ -0.51 (-1.45%)
PIBTL 14.23 Decreased By ▼ -0.48 (-3.26%)
PPL 221.00 Decreased By ▼ -0.36 (-0.16%)
PRL 90.89 Decreased By ▼ -0.33 (-0.36%)
PTC 59.25 Increased By ▲ 0.06 (0.1%)
SSGC 23.39 Increased By ▲ 0.09 (0.39%)
TBL 8.65 Decreased By ▼ -0.10 (-1.14%)
TELE 7.40 Decreased By ▼ -0.21 (-2.76%)
TPL 21.00 Decreased By ▼ -1.03 (-4.68%)
TPLP 12.02 Decreased By ▼ -0.54 (-4.3%)
TREET 21.33 Decreased By ▼ -0.40 (-1.84%)
TRG 54.35 Decreased By ▼ -1.44 (-2.58%)

KARACHI: Rehabilitation work on 25-kilometer railway track connecting the strategic Karachi Port Trust (KPT) with the City Station under ‘KPT Railways connectivity project’ is underway in full swing.

Once completed, the project will sow the seeds of economic prosperity to the already ailing public entity, said the newly appointed divisional superintendent (DS) Karachi Muhammad Hanif Gul during his visit to the KPT connectivity project along with PD KPT connectivity Riaz Ali Laghari and Deputy DS (Infrastructure) Shoukat Shaikh.

The DS said, “Besides significant surge in the volume of freight earnings, the project will massively ease out traffic congestion when it becomes operational,”

He said that the conclusion of the KPT railways connectivity project would not only bring an economic boon for Pakistan Railways but a new era of progress and prosperity would be ushered in also.

He was briefed by Project Director of KPT connectivity project that aims at rehabilitation of 25 kilometres of railways track connecting Karachi Port Trust with Karachi City station entailing 12 level crossings, various yards and 2 bridges enroute.

The DS also visited the Wazir Mansion station, a major container loading point, and was comprehensively briefed regarding the operational parameters by the concerned divisional officers.

Copyright Business Recorder, 2021

Comments

Comments are closed for this article.