BR100 Decreased By (-0.25%)
BR30 Decreased By (-0.64%)
KSE100 Decreased By (-0.41%)
KSE30 Decreased By (-0.67%)
BECO 5.83 Decreased By ▼ -0.20 (-3.32%)
BML 57.90 Increased By ▲ 5.15 (9.76%)
BOP 33.79 Decreased By ▼ -0.46 (-1.34%)
CNERGY 8.15 Decreased By ▼ -0.01 (-0.12%)
DCL 11.79 Decreased By ▼ -0.55 (-4.46%)
FCCL 53.49 Decreased By ▼ -0.40 (-0.74%)
FCSC 5.40 Increased By ▲ 0.18 (3.45%)
FFL 17.84 Decreased By ▼ -0.19 (-1.05%)
FNEL 1.30 No Change ▼ 0.00 (0%)
HUMNL 11.11 Increased By ▲ 0.11 (1%)
KEL 8.02 Decreased By ▼ -0.09 (-1.11%)
KOSM 5.45 Increased By ▲ 0.07 (1.3%)
MLCF 87.40 Decreased By ▼ -0.65 (-0.74%)
NBP 184.24 Decreased By ▼ -2.24 (-1.2%)
PACE 11.62 Increased By ▲ 0.90 (8.4%)
PAEL 40.25 Increased By ▲ 0.31 (0.78%)
PIAHCLA 26.12 Decreased By ▼ -0.05 (-0.19%)
PIBTL 17.14 Decreased By ▼ -0.18 (-1.04%)
PPL 228.73 Decreased By ▼ -4.05 (-1.74%)
PRL 34.49 Decreased By ▼ -0.46 (-1.32%)
PTC 67.54 Decreased By ▼ -0.02 (-0.03%)
SEARL 90.93 No Change ▼ 0.00 (0%)
SSGC 26.83 Decreased By ▼ -0.34 (-1.25%)
TELE 8.53 Decreased By ▼ -0.04 (-0.47%)
THCCL 66.14 Increased By ▲ 6.01 (10%)
TPLP 9.33 Increased By ▲ 0.57 (6.51%)
TREET 24.51 Decreased By ▼ -0.03 (-0.12%)
TRG 71.61 Decreased By ▼ -0.14 (-0.2%)
WAVES 10.98 Increased By ▲ 1.00 (10.02%)
WTL 1.28 Increased By ▲ 0.02 (1.59%)

ISLAMABAD: Managing Director Inter State Gas Systems (Pvt) Limited (ISGSL) Mobin Saulat Friday said laying of 427-kilometer Machike-Tarujabba oil pipeline would help avoid tragedies like Ahmedpur Sharqiya oil tanker rollover incident in which around 219 people had died and 59 were injured.

"The strategic project, which is being revived, will also help meet the ever growing requirements of an expanding economy and increase in POL products demand forecasts.

The ISGCL, being a government entity working under the Ministry of Energy, will be handling the project," the MD said while talking to APP here.

He said the pipeline was of great importance and strategic nature as it would ensure smooth and safe supply of white oil products High Speed Diesel and Motor Spirit Oil across the country.

Terming the pipeline “backbone” for oil transportation, he said it would be the safest, efficient and reliable mode of supplying petroleum products, avoiding the incidents of spilling of oil and rolling-over of tankers frequently taking place in different localities.

Mobin Saulat said the ISGSL had invited bids for construction of the pipeline from Machike (Sheikhpura) to Tarujabba (Peshawar) after the Economic Coordination Committee approved the project on November 1, 2017.

He said the pipeline would be constructed in three segments including Machike-Chakpirana (135-km of 18 inch diameter -proposed), Chakpirana to Rawat (117-km of 18 inch diameter- proposed) and Rawat to Tarujabba (175-km of 14 inch diameter-proposed).

The MD said the project would be implemented on Build, Own, Operate and Transfer (BOOT) basis having 15 years term through open tenders.

"The project will be capable of transporting dual oil products HSD and MS oil from Machike to Tarujabba via Chakpirana and Sihala depots, completing the pipeline from Karachi to Peshawar.

The feasibility study shows steady increase in demand of POL products and justifies the pipeline as it will have economic benefits and will be more advantageous over present trucking mode of transportation," he remarked.

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed for this article.