BR100 Decreased By (-0.41%)
BR30 Decreased By (-0.6%)
KSE100 Decreased By (-0.31%)
KSE30 Decreased By (-0.29%)
AGHA 6.64 Decreased By ▼ -0.03 (-0.45%)
BECO 4.39 Increased By ▲ 0.04 (0.92%)
BML 56.50 Increased By ▲ 0.33 (0.59%)
BOP 29.98 Decreased By ▼ -0.14 (-0.46%)
CNERGY 12.85 Decreased By ▼ -0.13 (-1%)
CSIL 5.24 Decreased By ▼ -0.07 (-1.32%)
FCCL 51.27 Decreased By ▼ -0.38 (-0.74%)
FFL 14.34 Decreased By ▼ -0.15 (-1.04%)
FNEL 1.20 Decreased By ▼ -0.01 (-0.83%)
KEL 6.02 Decreased By ▼ -0.04 (-0.66%)
KOSM 5.71 Decreased By ▼ -0.13 (-2.23%)
LOTCHEM 26.25 Increased By ▲ 0.08 (0.31%)
MLCF 89.25 Decreased By ▼ -1.98 (-2.17%)
NBP 162.50 Decreased By ▼ -1.69 (-1.03%)
NCPL 52.54 Decreased By ▼ -0.64 (-1.2%)
NPL 58.45 Decreased By ▼ -0.67 (-1.13%)
OGDC 313.70 Increased By ▲ 0.31 (0.1%)
PACE 9.78 Increased By ▲ 0.01 (0.1%)
PAEL 35.00 Decreased By ▼ -0.24 (-0.68%)
PIBTL 14.53 Decreased By ▼ -0.18 (-1.22%)
PPL 219.60 Decreased By ▼ -1.76 (-0.8%)
PRL 91.88 Increased By ▲ 0.66 (0.72%)
PTC 59.24 Increased By ▲ 0.05 (0.08%)
SSGC 23.12 Decreased By ▼ -0.18 (-0.77%)
TBL 8.60 Decreased By ▼ -0.15 (-1.71%)
TELE 7.45 Decreased By ▼ -0.16 (-2.1%)
TPL 21.70 Decreased By ▼ -0.33 (-1.5%)
TPLP 12.28 Decreased By ▼ -0.28 (-2.23%)
TREET 21.71 Decreased By ▼ -0.02 (-0.09%)
TRG 55.32 Decreased By ▼ -0.47 (-0.84%)

power-line0ISLAMABAD: President Pakistan Businessmen and Intellectuals Forum (PBIF), Mian Zahid Hussain said that rehabilitation of operational power plants could increase electricity generation by one hundred percent without any additional cost.

Decision of constructing dozens of power plants is good but the older ones should also be given attention as their proper maintenance is not very costly, he said.

Mian Zahid Hussain said that water storage capacity should be increased and hydel projects should be initiated without any further delay, he said in a statement issued here on Monday.

He was of the view that unnecessary delay in construction of dams has increased dependence on imported oil which has left country open to oil price shocks.

A claimed that a foreign experts has proposed to construct Chiniot dam in 1959 which would have generated 60 megawatt of electricity resulting in profit of Rs. 5 billion per annum and countered the floods resulting in losses to the tune of billions to the rural economy but the proposal was neither accepted nor rejected.

Increasing population requires government to take steps to increase water availability and storage otherwise people will have to face food security problem, he observed.

Copyright APP (Associated Press of Pakistan), 2017
 

Comments

Comments are closed for this article.