AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,546 Increased By 137.4 (1.85%)
BR30 24,809 Increased By 772.4 (3.21%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

imageKARACHI: The Karachi Electric (KE) on Monday claimed that the power supply to Dhabeji pumping station is as per schedule.

A statement of the utility reiterated that `in the better interest of the people of Karachi, K-Electric provides all possible support to KWSB and all of its strategic installations are exempted from load-shed'.

The utility confirmed that due to a technical fault power supply to Dhabeji was partially affected on Sunday. The KE teams mobilized immediately to rectify the issue and within a short span of time power was restored to all but one pump.

KE teams continued to work round the clock and supply to the last remaining pump was also normalized, the statement added.

It said that the K-Electric has invested significantly to provide primary as well as backup feeder facility available for Dhabeji pumping station.

However, due to KWSB's infrastructural challenges they are unable to fully benefit from this facility, the KE statement further maintained.

`K-Electric appeals to Water Board management to invest in system upgrades', it suggested.

In line with its commitment to provide seamless services, KE teams continue to work on-ground round the clock to provide maximum relief to the people of Karachi.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.