BR100 Decreased By (-0.91%)
BR30 Decreased By (-1.47%)
KSE100 Decreased By (-0.78%)
KSE30 Decreased By (-0.75%)
AGHA 6.67 Decreased By ▼ -0.01 (-0.15%)
BECO 4.35 Decreased By ▼ -0.02 (-0.46%)
BML 56.17 Decreased By ▼ -1.15 (-2.01%)
BOP 30.12 Decreased By ▼ -0.23 (-0.76%)
CNERGY 12.98 Decreased By ▼ -0.14 (-1.07%)
CSIL 5.31 Decreased By ▼ -0.10 (-1.85%)
FCCL 51.65 Decreased By ▼ -1.14 (-2.16%)
FFL 14.49 Decreased By ▼ -0.23 (-1.56%)
FNEL 1.21 Increased By ▲ 0.09 (8.04%)
KEL 6.06 Decreased By ▼ -0.03 (-0.49%)
KOSM 5.84 Increased By ▲ 0.11 (1.92%)
LOTCHEM 26.17 Decreased By ▼ -0.29 (-1.1%)
MLCF 91.23 Decreased By ▼ -1.93 (-2.07%)
NBP 164.19 Decreased By ▼ -0.47 (-0.29%)
NCPL 53.18 Decreased By ▼ -2.48 (-4.46%)
NPL 59.12 Decreased By ▼ -2.04 (-3.34%)
OGDC 313.39 Decreased By ▼ -3.34 (-1.05%)
PACE 9.77 Decreased By ▼ -0.10 (-1.01%)
PAEL 35.24 Decreased By ▼ -0.39 (-1.09%)
PIBTL 14.71 Increased By ▲ 0.03 (0.2%)
PPL 221.36 Decreased By ▼ -5.55 (-2.45%)
PRL 91.22 Decreased By ▼ -1.80 (-1.94%)
PTC 59.19 Decreased By ▼ -1.07 (-1.78%)
SSGC 23.30 Decreased By ▼ -0.51 (-2.14%)
TBL 8.75 No Change ▼ 0.00 (0%)
TELE 7.61 Decreased By ▼ -0.19 (-2.44%)
TPL 22.03 Decreased By ▼ -0.32 (-1.43%)
TPLP 12.56 Decreased By ▼ -0.41 (-3.16%)
TREET 21.73 Decreased By ▼ -0.43 (-1.94%)
TRG 55.79 Decreased By ▼ -0.77 (-1.36%)

imageKARACHI: Pakistan Petroleum Limited (PPL) has announced gas discovery at its exploration well at Hadi, in district Sanghar, an official announced here on Friday.

He said that PPL, the operator of Gambat South Block with 65 percent working interest (WI) along with its joint venture partners, Government Holdings Private Limited and Asia Resources Oil Limited with 25 percent and 10 percent WI, respectively has announced a gas discovery at its exploration well Hadi X-1A located in District Sanghar, Sindh.

It was pointed out that Hadi X-1A was spud on February 5, 2016 and reached the final depth of 4,020 meters on April 19, 2016. Based on wireline logs interpretation, potential hydrocarbon bearing zones were identified in Sembar Formation.

During initial testing in Sembar Formation immeasurable amount of gas flowed at the surface for three days and reservoir appeared to be tight.

To further evaluate tight gas potential Frac job was conducted after which flow rates improved significantly. The well flowed at 0.85 MMscfd gas at 32/64 inches choke size, thus confirming the presence of natural gas at Hadi X-1A.

Post Frac results suggest that it is a tight gas discovery. However, further evaluation is required to determine the size and commerciality of the discovery, based on post well studies and its integration with geological, geophysical and engineering data collected during drilling and testing of the well.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed for this article.