BR100 Decreased By (-0.38%)
BR30 Decreased By (-0.46%)
KSE100 Decreased By (-0.42%)
KSE30 Decreased By (-0.52%)
AGHA 7.44 Decreased By ▼ -0.12 (-1.59%)
BECO 5.08 Decreased By ▼ -0.01 (-0.2%)
BML 56.50 Increased By ▲ 1.52 (2.76%)
BOP 32.73 Decreased By ▼ -0.25 (-0.76%)
CNERGY 10.31 Increased By ▲ 0.21 (2.08%)
CSIL 5.30 Increased By ▲ 0.17 (3.31%)
FCCL 51.90 Increased By ▲ 0.65 (1.27%)
FFL 16.50 Increased By ▲ 0.32 (1.98%)
FNEL 1.22 Increased By ▲ 0.03 (2.52%)
KEL 7.16 Increased By ▲ 0.10 (1.42%)
KOSM 6.07 Increased By ▲ 0.53 (9.57%)
LOTCHEM 26.80 Decreased By ▼ -2.32 (-7.97%)
MLCF 88.20 Decreased By ▼ -0.62 (-0.7%)
NBP 193.06 Decreased By ▼ -4.43 (-2.24%)
NCPL 55.40 Increased By ▲ 0.38 (0.69%)
NPL 64.69 Decreased By ▼ -0.19 (-0.29%)
OGDC 310.80 Decreased By ▼ -1.15 (-0.37%)
PACE 10.40 Increased By ▲ 0.19 (1.86%)
PAEL 40.95 Decreased By ▼ -0.04 (-0.1%)
PIBTL 15.84 Decreased By ▼ -0.12 (-0.75%)
PPL 211.00 Decreased By ▼ -1.66 (-0.78%)
PRL 52.80 Increased By ▲ 0.26 (0.49%)
PTC 68.10 Decreased By ▼ -0.98 (-1.42%)
SSGC 24.85 Decreased By ▼ -0.25 (-1%)
TBL 9.50 Decreased By ▼ -0.12 (-1.25%)
TELE 8.30 Decreased By ▼ -0.02 (-0.24%)
TPL 18.30 Increased By ▲ 0.55 (3.1%)
TPLP 13.02 Decreased By ▼ -0.20 (-1.51%)
TREET 21.40 Decreased By ▼ -0.34 (-1.56%)
TRG 59.00 Increased By ▲ 2.11 (3.71%)

imageISLAMABAD: Sui Northern Gas Pipelines Company Limited (SNGPL) is upgrading its existing transmission system to ensure regular gas pressure in pipelines.

"Following the improved gas supply to domestic and commercial consumers mainly due to import of Liquified Natural Gas (LNG), the existing transmission system needs upgradation," official sources in the Ministry of Petroleum and Natural Resources told APP.

Under the upgradation plan, they informed that Rs 8.7 million had been allocated for improving the Rawalpindi transmission system to end low gas pressure the residents facing especially in the winter season.

Commenting on complaints of shortage and low gas pressure in several areas of the city, they said the government was making concerted efforts to rectify them.

"The low gas pressure is mainly caused due to shortage of the commodity particularly during the winter season and the outdated supply lines. The problem will be overcome due to arrival of additional gas in the system and improvement of the transmission system," they said.

One of the main reasons behind the low gas pressure, they said, was the increased number of housing colonies and societies with the passage of time in the city.

SNGPL, they said, was undertaking system augmentation, looping of line, re-drilling of service tee, establishment of emergency teams to resolve low pressure complaints. "Operational teams are working round the clock for this particular activity."

They said there was gas shortage in the country and the required measures were being taken to overcome it, adding that LNG was being imported, and practical work on TAPI (Turkmenistan, Afghanistan, Pakistan and India) and IP (Iran- Pakistan) gas pipelines was going to start soon.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed for this article.