BR100 Decreased By (-0.02%)
BR30 Increased By (0.15%)
KSE100 Increased By (0.02%)
KSE30 Decreased By (-0.01%)
AGHA 7.36 Decreased By ▼ -0.20 (-2.65%)
BECO 5.10 Increased By ▲ 0.01 (0.2%)
BML 56.10 Increased By ▲ 1.12 (2.04%)
BOP 32.83 Decreased By ▼ -0.15 (-0.45%)
CNERGY 10.35 Increased By ▲ 0.25 (2.48%)
CSIL 5.07 Decreased By ▼ -0.06 (-1.17%)
FCCL 52.08 Increased By ▲ 0.83 (1.62%)
FFL 16.34 Increased By ▲ 0.16 (0.99%)
FNEL 1.21 Increased By ▲ 0.02 (1.68%)
KEL 7.18 Increased By ▲ 0.12 (1.7%)
KOSM 5.90 Increased By ▲ 0.36 (6.5%)
LOTCHEM 26.93 Decreased By ▼ -2.19 (-7.52%)
MLCF 89.50 Increased By ▲ 0.68 (0.77%)
NBP 194.99 Decreased By ▼ -2.50 (-1.27%)
NCPL 55.61 Increased By ▲ 0.59 (1.07%)
NPL 64.83 Decreased By ▼ -0.05 (-0.08%)
OGDC 312.40 Increased By ▲ 0.45 (0.14%)
PACE 10.28 Increased By ▲ 0.07 (0.69%)
PAEL 40.70 Decreased By ▼ -0.29 (-0.71%)
PIBTL 15.95 Decreased By ▼ -0.01 (-0.06%)
PPL 212.70 Increased By ▲ 0.04 (0.02%)
PRL 53.51 Increased By ▲ 0.97 (1.85%)
PTC 69.00 Decreased By ▼ -0.08 (-0.12%)
SSGC 24.85 Decreased By ▼ -0.25 (-1%)
TBL 9.52 Decreased By ▼ -0.10 (-1.04%)
TELE 8.35 Increased By ▲ 0.03 (0.36%)
TPL 18.15 Increased By ▲ 0.40 (2.25%)
TPLP 12.98 Decreased By ▼ -0.24 (-1.82%)
TREET 21.42 Decreased By ▼ -0.32 (-1.47%)
TRG 59.33 Increased By ▲ 2.44 (4.29%)

imageISLAMABAD: Pakistan Railways has decided to conduct a fresh feasibility study for connecting Dera Ismail Khan with Quetta under Medium Term Development Framework (2020-25) of China-Pakistan Economic Corridor (CPEC).

According to official documents, the fresh input/Terms of Reference (TORs) are being prepared for implementation of the project.

The connectivity of Dera Ismail Khan with Quetta is a part of future Railways Development Plan. The proposed route, 538 Km in length will connect Quetta with DI Khan via Bostan and Zhob, the documents added.

Giving details of the route, it said, Quetta-Bostan was 33 Km, Bostan to Zhob via Muslim, Bagh-Qila Saif-Ullah 295 Km, Zhob-DI Khan 185 km and DI Khan-Kotla Jam (near Bhakkar) 25 Km.

It is pertinent to mention here that the feasibility study of the project was carried out during 2006-07. Linking this route will develop far flung areas of Khyber Pakhtunkhwa and Balochistan.

With the completion of this route the distance from Quetta to Peshawar will be reduced 670 km as compared to Main Line-I (from Quetta to Peshawar).

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed for this article.