BR100 Decreased By (-0.02%)
BR30 Increased By (0.15%)
KSE100 Increased By (0.02%)
KSE30 Decreased By (-0.01%)
AGHA 7.36 Decreased By ▼ -0.20 (-2.65%)
BECO 5.10 Increased By ▲ 0.01 (0.2%)
BML 56.10 Increased By ▲ 1.12 (2.04%)
BOP 32.81 Decreased By ▼ -0.17 (-0.52%)
CNERGY 10.35 Increased By ▲ 0.25 (2.48%)
CSIL 5.07 Decreased By ▼ -0.06 (-1.17%)
FCCL 52.08 Increased By ▲ 0.83 (1.62%)
FFL 16.34 Increased By ▲ 0.16 (0.99%)
FNEL 1.21 Increased By ▲ 0.02 (1.68%)
KEL 7.18 Increased By ▲ 0.12 (1.7%)
KOSM 5.90 Increased By ▲ 0.36 (6.5%)
LOTCHEM 26.93 Decreased By ▼ -2.19 (-7.52%)
MLCF 89.50 Increased By ▲ 0.68 (0.77%)
NBP 194.53 Decreased By ▼ -2.96 (-1.5%)
NCPL 55.59 Increased By ▲ 0.57 (1.04%)
NPL 64.84 Decreased By ▼ -0.04 (-0.06%)
OGDC 312.40 Increased By ▲ 0.45 (0.14%)
PACE 10.34 Increased By ▲ 0.13 (1.27%)
PAEL 40.80 Decreased By ▼ -0.19 (-0.46%)
PIBTL 15.97 Increased By ▲ 0.01 (0.06%)
PPL 212.99 Increased By ▲ 0.33 (0.16%)
PRL 53.63 Increased By ▲ 1.09 (2.07%)
PTC 68.75 Decreased By ▼ -0.33 (-0.48%)
SSGC 24.89 Decreased By ▼ -0.21 (-0.84%)
TBL 9.52 Decreased By ▼ -0.10 (-1.04%)
TELE 8.35 Increased By ▲ 0.03 (0.36%)
TPL 18.10 Increased By ▲ 0.35 (1.97%)
TPLP 12.98 Decreased By ▼ -0.24 (-1.82%)
TREET 21.42 Decreased By ▼ -0.32 (-1.47%)
TRG 59.33 Increased By ▲ 2.44 (4.29%)
Pakistan

Taking steps to overcome energy crisis: SEPCO

Published Updated

imageSUKKUR: Sukkur Electric Power Company (SEPCO) is taking all possible steps to overcome the energy crisis, however, the crisis can be overcome with the cooperation of consumers only, said spokesman for SEPCO here on Monday.

He said that the general public is requested to save the energy by means of less consumption especially during the peak hours, from 6.00 P.M. to 11.00 P.M. While petrol pumps and jewellery shops have also been asked for avoiding the use of decorative lights. He said that domestic consumers have also been requested to use energy savers and tube lights instead of bulbs so that energy could be saved.

He further said that tube-well operators are directed for operating tube-wells in accordance with load shedding schedule as customers could not face difficulties in getting water.

Copyright APP (Associated Press of Pakistan), 2015

Comments

Comments are closed for this article.