AIRLINK 72.80 Increased By ▲ 0.62 (0.86%)
BOP 5.06 Increased By ▲ 0.13 (2.64%)
CNERGY 4.33 Decreased By ▼ -0.02 (-0.46%)
DFML 30.52 Increased By ▲ 2.03 (7.13%)
DGKC 85.95 Increased By ▲ 4.65 (5.72%)
FCCL 22.35 Increased By ▲ 0.85 (3.95%)
FFBL 33.22 Increased By ▲ 0.17 (0.51%)
FFL 9.78 Decreased By ▼ -0.08 (-0.81%)
GGL 10.40 Decreased By ▼ -0.08 (-0.76%)
HBL 113.62 Decreased By ▼ -0.38 (-0.33%)
HUBC 136.20 Decreased By ▼ -3.80 (-2.71%)
HUMNL 10.03 Increased By ▲ 1.00 (11.07%)
KEL 4.66 Decreased By ▼ -0.07 (-1.48%)
KOSM 4.40 Increased By ▲ 0.02 (0.46%)
MLCF 38.35 Increased By ▲ 0.70 (1.86%)
OGDC 133.40 Decreased By ▼ -0.30 (-0.22%)
PAEL 27.40 Increased By ▲ 1.80 (7.03%)
PIAA 24.76 Increased By ▲ 0.78 (3.25%)
PIBTL 6.55 Increased By ▲ 0.07 (1.08%)
PPL 121.21 Decreased By ▼ -1.41 (-1.15%)
PRL 27.15 Increased By ▲ 0.08 (0.3%)
PTC 13.89 Increased By ▲ 0.29 (2.13%)
SEARL 60.40 Increased By ▲ 3.78 (6.68%)
SNGP 68.53 Decreased By ▼ -0.71 (-1.03%)
SSGC 10.33 Decreased By ▼ -0.01 (-0.1%)
TELE 9.05 Increased By ▲ 0.60 (7.1%)
TPLP 11.26 Decreased By ▼ -0.02 (-0.18%)
TRG 65.70 Increased By ▲ 4.49 (7.34%)
UNITY 25.25 Decreased By ▼ -0.08 (-0.32%)
WTL 1.50 No Change ▼ 0.00 (0%)
BR100 7,608 Decreased By -22.2 (-0.29%)
BR30 25,091 Increased By 100.6 (0.4%)
KSE100 72,658 Increased By 56.2 (0.08%)
KSE30 23,383 Decreased By -155.9 (-0.66%)
Pakistan Print 2019-12-04

Murad orders appointment of Malir Expressway PD

Sindh Chief Minister Syed Murad Ali Shah on Tuesday directed Chief Secretary to appoint a Project Director for Malir Expressway so that it could be started within next seven months. Chief minister was presiding over a meeting to review the development pro
Published 04 Dec, 2019 12:00am

Sindh Chief Minister Syed Murad Ali Shah on Tuesday directed Chief Secretary to appoint a Project Director for Malir Expressway so that it could be started within next seven months. Chief minister was presiding over a meeting to review the development projects being launched on PPP mode.

The CM was told that the tenders for Malir Expressway have been opened and LoI would be issued within a week for financial close. It is an around Rs30 billion project and would be completed within two years.

Murad directed Board of Revenue to issue notification of Right of Way (ROW) for Malir-River bed. He also directed his Advisor on Law to seek permission from the Supreme Court for lifting of sand from Malir River bed.

The Advisor on Law said that an application for the purpose has been filed in the court but hearing date has not been fixed yet. He assured the chair that he would get the hearing fixed on a special request.

Water Initiative for West: With over four million populations at a benchmark of 40 gallons per person per day, the estimated water demand in the Karachi's West region has a total water demand of approximately 160 MGD. The KWSB estimated the demand to be approximately 200 MGD. Karachi West currently receives 5 to 60 MGD from Hub Dam and 20 to 30 MGD from Dhabeji.

It was pointed out that by year 2020 the district would have a population of approximately 5.5 million creating a latent water demand of about 300 MGD.

CM decided to launch revamping of Hub Canal project. The project pertained to revamping the entire bulk water supply system from Hub Canal to District West. The chief minister was told that the project would cost around Rs 6 billion.

It was estimated that the Hub Water Canal has 30 to 50 MGD water losses due to major leakages, punctures and losses at various locations. The major component of the project would be repair and upgradation of the canal; increasing the capacity of filter plant from 80 MGD to 100 MGD and upgradation of pump house. The chief minister proposed alternative energy solution for the project.

The CM directed PPP unit DG Khalid Shaikh to initiate the project on PPP mode.

CM also approved four Urban Road projects for the city on PPP mode. They are construction of four-lane bridge over Malir River at causeway connecting Korangi crossing with KPT Interchange. Construction of four-lane expressway on the left bank of Malir River from new bridge approach to PAF gate. It would be six-kilometer bridge/road.

Construction of ICI Interchange at Junction of ICI Bridge and Jinnah Bridge. The CM directed Local Government Minister Syed Nasir Shah to coordinate with KPT authorities so that this project could be launched.

The fourth project is construction of four lane expressway from Mauripur Road to Y Junction through the back water of truck stand.

The CM directed board of revenue to assess the land and report him so that the projects could be started.

The Irrigation department is working on development of canal from Makhi Farash up to Nabisar for supplying of 200 cusecs of water. The canal is expected to be completed by May 2020.

Irrigation Department has recently received a proposal from a private firm to implement project of 'Supply of Industrial Water from Nabisar to Vajihar.

The CM directed the PPP unit to examine the proposal and put up his recommendation. The canal construction from Makhi Farash to Nabisar has almost been done but only a 65 km pipeline from Nabisar to Vajihar has to be laid.

The CM directed minister energy to personally monitor the work on the project and get it done within stipulated time as has been conveyed to the private firms working in Block-I and II.

The meeting was attended by Chief Secretary Mumtaz Shah, provincial cabinet members, Nisar Khuhro, Dr Azra Fazal Pechuho, Imtiaz Shaikh, Syed Nasir Shah, Murtaza Wahab, secretaries of different departments, including Board of Revenue and DG PPP Unit Khalid Shaikh.

Copyright Business Recorder, 2019

Comments

Comments are closed.