AIRLINK 74.85 Increased By ▲ 0.56 (0.75%)
BOP 4.98 Increased By ▲ 0.03 (0.61%)
CNERGY 4.49 Increased By ▲ 0.12 (2.75%)
DFML 40.00 Increased By ▲ 1.20 (3.09%)
DGKC 86.35 Increased By ▲ 1.53 (1.8%)
FCCL 21.36 Increased By ▲ 0.15 (0.71%)
FFBL 33.85 Decreased By ▼ -0.27 (-0.79%)
FFL 9.72 Increased By ▲ 0.02 (0.21%)
GGL 10.45 Increased By ▲ 0.03 (0.29%)
HBL 112.74 Decreased By ▼ -0.26 (-0.23%)
HUBC 137.44 Increased By ▲ 1.24 (0.91%)
HUMNL 11.42 Decreased By ▼ -0.48 (-4.03%)
KEL 5.28 Increased By ▲ 0.57 (12.1%)
KOSM 4.63 Increased By ▲ 0.19 (4.28%)
MLCF 37.80 Increased By ▲ 0.15 (0.4%)
OGDC 139.50 Increased By ▲ 3.30 (2.42%)
PAEL 25.61 Increased By ▲ 0.51 (2.03%)
PIAA 20.68 Increased By ▲ 1.44 (7.48%)
PIBTL 6.80 Increased By ▲ 0.09 (1.34%)
PPL 122.20 Increased By ▲ 0.10 (0.08%)
PRL 26.58 Decreased By ▼ -0.07 (-0.26%)
PTC 14.05 Increased By ▲ 0.12 (0.86%)
SEARL 58.98 Increased By ▲ 1.76 (3.08%)
SNGP 68.95 Increased By ▲ 1.35 (2%)
SSGC 10.30 Increased By ▲ 0.05 (0.49%)
TELE 8.38 Decreased By ▼ -0.02 (-0.24%)
TPLP 11.06 Decreased By ▼ -0.07 (-0.63%)
TRG 64.19 Increased By ▲ 1.38 (2.2%)
UNITY 26.55 Increased By ▲ 0.05 (0.19%)
WTL 1.45 Increased By ▲ 0.10 (7.41%)
BR100 7,841 Increased By 30.9 (0.4%)
BR30 25,465 Increased By 315.4 (1.25%)
KSE100 75,114 Increased By 157.8 (0.21%)
KSE30 24,114 Increased By 30.8 (0.13%)

Karachi Water and Sewerage Board (KW&SB) will not be able to ensure equable distribution of water to all parts of Karachi in the holy month of Ramazan should K-Electric fails to ensure uninterrupted power supply to its water distribution stations. Also, the KW&SB has asked the power company to exempt all of its water pumping stations from load shedding.
KW&SB Managing Director (MD) Asadullah Khan in a statement has asked the power utility to supply power continuously to the board's 154 water pumping stations and five main distribution units. "Uninterrupted power supply to KWSB is crucial," he said. Khan also underscored the need of coordinated efforts of KE and KW&SB officials to resolve the bilateral issues and facilitate consumers particularly during the sizzling summer.
He said that the board's pumping stations were badly affected due to frequent power suspension and it resulted in suspension of water supply to parts of the city. Moreover, KW&SB's Chief Engineer (Electrical and Mechanical) Intekhab Ahmad Rajput and Executive Engineer (E&M water pumping stations) Syed Mazhar Hussain held a meeting with KE officials. They requested the KE for uninterrupted power supply to the board's installations.

Copyright Business Recorder, 2019

Comments

Comments are closed.