BR100 Increased By (0.3%)
BR30 Increased By (0.41%)
KSE100 Decreased By (-0.05%)
KSE30 Decreased By (-0.06%)
AGHA 7.47 Decreased By ▼ -0.09 (-1.19%)
BECO 5.15 Increased By ▲ 0.06 (1.18%)
BML 54.81 Decreased By ▼ -0.17 (-0.31%)
BOP 33.13 Increased By ▲ 0.15 (0.45%)
CNERGY 10.34 Increased By ▲ 0.24 (2.38%)
CSIL 5.14 Increased By ▲ 0.01 (0.19%)
FCCL 52.30 Increased By ▲ 1.05 (2.05%)
FFL 16.50 Increased By ▲ 0.32 (1.98%)
FNEL 1.22 Increased By ▲ 0.03 (2.52%)
KEL 7.21 Increased By ▲ 0.15 (2.12%)
KOSM 5.86 Increased By ▲ 0.32 (5.78%)
LOTCHEM 27.17 Decreased By ▼ -1.95 (-6.7%)
MLCF 90.30 Increased By ▲ 1.48 (1.67%)
NBP 196.90 Decreased By ▼ -0.59 (-0.3%)
NCPL 55.70 Increased By ▲ 0.68 (1.24%)
NPL 65.49 Increased By ▲ 0.61 (0.94%)
OGDC 313.78 Increased By ▲ 1.83 (0.59%)
PACE 10.40 Increased By ▲ 0.19 (1.86%)
PAEL 41.25 Increased By ▲ 0.26 (0.63%)
PIBTL 16.06 Increased By ▲ 0.10 (0.63%)
PPL 213.83 Increased By ▲ 1.17 (0.55%)
PRL 54.15 Increased By ▲ 1.61 (3.06%)
PTC 69.99 Increased By ▲ 0.91 (1.32%)
SSGC 25.16 Increased By ▲ 0.06 (0.24%)
TBL 9.56 Decreased By ▼ -0.06 (-0.62%)
TELE 8.37 Increased By ▲ 0.05 (0.6%)
TPL 18.20 Increased By ▲ 0.45 (2.54%)
TPLP 13.10 Decreased By ▼ -0.12 (-0.91%)
TREET 21.41 Decreased By ▼ -0.33 (-1.52%)
TRG 59.98 Increased By ▲ 3.09 (5.43%)
Pakistan

Govt striving hard to change stale electricity transmission system

HARIPUR: Federal Minister for Water and Power, Omer Ayub Ayub Khan Monday said the government was striving hard to c
Published Updated

HARIPUR: Federal Minister for Water and Power, Omer Ayub Ayub Khan Monday said the government was striving hard to change the old electricity transmission system of Wapda to provide uninterrupted power supply to domestic and industrial consumers.

“Soon we would change the stale electricity transmission system of Wapda across the country and will bring the modern technology to improve overall electricity transmission system for benefits of masses,” said Water and Power Omer Ayub Khan while addressing a public gathering here at Kot Najibullah.

Speaking on the occasion, the Minister said that government was encouraging investment in power sector and stressed the need of setting up of new industries in Hattar Industrial Estate. He maintained that new industries would provide employment to people.

The government would install four new grid stations in Haripur district to resolve the issue of low voltage and unscheduled load-shedding with the cost of billions of rupees, he said, adding tenders of Rs450 million has been opened for award of contract for construction of three bridges in Kot Najibullah.

Giving details of new projects of Wapda for the district, the Minister said during last two months, we have approved 220 KV grid station for Haripur with a cost of more than Rs9 billion and three 132 KV grid stations for Khanpur, Sarai Saleh and Hattar.

He maintained that for Darband Manshera district a grid station of 132 KV has been approved which would also benefit district.

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed for this article.