BR100 Increased By (1.77%)
BR30 Increased By (1.96%)
KSE100 Increased By (1.59%)
KSE30 Increased By (1.65%)
BECO 5.62 Increased By ▲ 0.04 (0.72%)
BML 59.51 Decreased By ▼ -1.71 (-2.79%)
BOP 34.61 Increased By ▲ 0.93 (2.76%)
CNERGY 8.08 No Change ▼ 0.00 (0%)
DCL 12.05 Increased By ▲ 0.41 (3.52%)
FCCL 54.40 Increased By ▲ 2.26 (4.33%)
FCSC 5.52 Decreased By ▼ -0.11 (-1.95%)
FFL 18.05 Increased By ▲ 0.04 (0.22%)
FNEL 1.33 Decreased By ▼ -0.02 (-1.48%)
HUMNL 11.07 Increased By ▲ 0.03 (0.27%)
KEL 8.05 Increased By ▲ 0.21 (2.68%)
KOSM 5.88 Increased By ▲ 0.15 (2.62%)
MLCF 90.52 Increased By ▲ 4.01 (4.64%)
NBP 190.17 Increased By ▲ 5.87 (3.19%)
PACE 11.53 Decreased By ▼ -0.12 (-1.03%)
PAEL 41.07 Increased By ▲ 1.11 (2.78%)
PIAHCLA 25.84 Increased By ▲ 0.17 (0.66%)
PIBTL 17.51 Increased By ▲ 0.24 (1.39%)
PPL 225.84 Increased By ▲ 3.17 (1.42%)
PRL 34.63 Increased By ▲ 0.17 (0.49%)
PTC 64.62 Increased By ▲ 0.88 (1.38%)
SEARL 91.38 Increased By ▲ 0.92 (1.02%)
SSGC 26.97 Increased By ▲ 0.30 (1.12%)
TELE 8.93 Increased By ▲ 0.02 (0.22%)
THCCL 69.16 Increased By ▲ 0.69 (1.01%)
TPLP 10.90 Decreased By ▼ -0.30 (-2.68%)
TREET 24.64 Decreased By ▼ -0.06 (-0.24%)
TRG 69.78 Decreased By ▼ -0.81 (-1.15%)
WAVES 11.16 Increased By ▲ 0.05 (0.45%)
WTL 1.27 No Change ▼ 0.00 (0%)

Lahore Development Authority (LDA) has invited application for prequalification of contractors or Engineering Firms registered with Pakistan Engineering Council (PEC) for construction of 'Elevated Expressway along with Bus Stations and Allied Facilities from Zafar Ali Road/Main Boulevard Gulberg to Ring Road/Motorway M-2, Lahore. The approximate length of the Project is 10.7 Km which mainly passes over Cantt Drain and comprises of elevated RCC Structures along with at grade portions.
The project also includes constructions of bus stations and approach exit ramps at selected locations along the route on Elevated Expressway. The approximate cost of the Project is 25000 million. The project will be executed in groups. The complete applications strictly as per RFQ documents will be received up to 16.03.2017 till 2.00 pm and will be opened at 2:30 pm (same day & date) in the presence of bidder or their representative who wishes to remain present. Meanwhile, Staff of Town Planning Wing of LDA demolished ten illegal constructions and sealed another one in various localities of city on Monday, during its ongoing drive against violation of building regulations.

Comments

Comments are closed for this article.