AIRLINK 74.55 Increased By ▲ 0.26 (0.35%)
BOP 4.97 Increased By ▲ 0.02 (0.4%)
CNERGY 4.47 Increased By ▲ 0.10 (2.29%)
DFML 39.94 Increased By ▲ 1.14 (2.94%)
DGKC 86.00 Increased By ▲ 1.18 (1.39%)
FCCL 21.30 Increased By ▲ 0.09 (0.42%)
FFBL 33.81 Decreased By ▼ -0.31 (-0.91%)
FFL 9.72 Increased By ▲ 0.02 (0.21%)
GGL 10.45 Increased By ▲ 0.03 (0.29%)
HBL 113.00 No Change ▼ 0.00 (0%)
HUBC 137.20 Increased By ▲ 1.00 (0.73%)
HUMNL 11.35 Decreased By ▼ -0.55 (-4.62%)
KEL 5.22 Increased By ▲ 0.51 (10.83%)
KOSM 4.60 Increased By ▲ 0.16 (3.6%)
MLCF 37.60 Decreased By ▼ -0.05 (-0.13%)
OGDC 139.30 Increased By ▲ 3.10 (2.28%)
PAEL 25.55 Increased By ▲ 0.45 (1.79%)
PIAA 20.68 Increased By ▲ 1.44 (7.48%)
PIBTL 6.78 Increased By ▲ 0.07 (1.04%)
PPL 122.15 Increased By ▲ 0.05 (0.04%)
PRL 26.50 Decreased By ▼ -0.15 (-0.56%)
PTC 14.03 Increased By ▲ 0.10 (0.72%)
SEARL 59.00 Increased By ▲ 1.78 (3.11%)
SNGP 68.50 Increased By ▲ 0.90 (1.33%)
SSGC 10.35 Increased By ▲ 0.10 (0.98%)
TELE 8.42 Increased By ▲ 0.02 (0.24%)
TPLP 11.14 Increased By ▲ 0.01 (0.09%)
TRG 64.10 Increased By ▲ 1.29 (2.05%)
UNITY 26.55 Increased By ▲ 0.05 (0.19%)
WTL 1.45 Increased By ▲ 0.10 (7.41%)
BR100 7,832 Increased By 22.2 (0.28%)
BR30 25,424 Increased By 274.1 (1.09%)
KSE100 75,091 Increased By 134 (0.18%)
KSE30 24,100 Increased By 17 (0.07%)

LAHORE: Ministry of Water and Power has said that all the damages caused to the electricity lines by heavy rainstorm on Saturday evening in different areas of the country have been completely restored and there was no forced load shedding on any feeder across the country throughout the day. The statement said that at Sehri time all the domestic feeders in the country were exempted from load shedding one hour before and half an hour after as per the schedule, except for the system constraints that existed in very few areas.
The system currently is generating an average of 15400 MW electricity while at peak time reached upto 16000 MW.
Due to effective measures taken for closing the industry at the time of Iftar, Tarawee and Seheri timings, all the available electricity is being provided to the domestic consumers. Special instructions have been passed to ensure closing the industry on mix feeders so that maximum electricity can be provided to the domestic consumers. According special teams have been formed by each Distraction company to monitor and enforce the load shedding schedule for the industry both on independent and mix feeders.
The Secretary Ministry of Water and Power Mohammad Younus Dagha along with other officials has been continuously monitoring the situation. Regular video and internet link conference is conducted between the Ministry of Water and Power and the Distribution Companies.
The Federal Complaint cell is also working round the clock to redress the complaints from consumers.
The Ministry of Water and Power is working hard to provide maximum relief to the consumers across the country. There are 637,435 transformers at the distribution system across the country expect the Karachi being operated by K-Electric. There may be localised faults or damage for which continuous efforts are being made to attend complaints within shortest time frame.

Copyright Business Recorder, 2015

Comments

Comments are closed.