BR100 Increased By (1.1%)
BR30 Increased By (1.26%)
KSE100 Increased By (1.03%)
KSE30 Increased By (1.16%)
BECO 5.41 Increased By ▲ 0.02 (0.37%)
BML 57.08 Increased By ▲ 0.60 (1.06%)
BOP 35.96 Increased By ▲ 0.87 (2.48%)
CNERGY 8.22 Increased By ▲ 0.05 (0.61%)
DCL 11.83 Increased By ▲ 0.39 (3.41%)
FCCL 58.62 Increased By ▲ 1.07 (1.86%)
FCSC 5.00 No Change ▼ 0.00 (0%)
FFL 17.85 Decreased By ▼ -0.03 (-0.17%)
FNEL 1.27 Increased By ▲ 0.02 (1.6%)
HUMNL 11.51 Increased By ▲ 0.34 (3.04%)
KEL 8.33 Decreased By ▼ -0.21 (-2.46%)
KOSM 6.63 Decreased By ▼ -0.10 (-1.49%)
MLCF 106.80 Decreased By ▼ -0.11 (-0.1%)
NBP 202.50 Increased By ▲ 4.00 (2.02%)
PACE 11.09 Increased By ▲ 0.02 (0.18%)
PAEL 44.86 Decreased By ▼ -0.59 (-1.3%)
PIAHCLA 31.56 Increased By ▲ 0.13 (0.41%)
PIBTL 18.88 Decreased By ▼ -0.20 (-1.05%)
PPL 244.00 Increased By ▲ 1.38 (0.57%)
PRL 36.08 Increased By ▲ 0.41 (1.15%)
PTC 70.71 Increased By ▲ 5.19 (7.92%)
SEARL 94.70 Increased By ▲ 0.16 (0.17%)
SSGC 31.89 Decreased By ▼ -0.19 (-0.59%)
TELE 9.06 Increased By ▲ 0.19 (2.14%)
THCCL 67.95 Increased By ▲ 2.29 (3.49%)
TPLP 10.59 Decreased By ▼ -0.14 (-1.3%)
TREET 25.81 Increased By ▲ 0.70 (2.79%)
TRG 64.80 Increased By ▲ 1.13 (1.77%)
WAVES 10.90 Increased By ▲ 0.20 (1.87%)
WTL 1.28 Increased By ▲ 0.03 (2.4%)

LAHORE: The Lahore Electric Supply Company (LESCO) enforcement teams during crackdown against electricity theft, meter tampering, and illegal power usage, uncovered meter security breach cases involving a tube well and a commercial connection in separate operations.

According to LESCO authorities, the Metering & Testing (M&T) Eastern Shalimar team carried out action in the Jati Umrah subdivision and detected a security breach in the meter of a commercial hostel connection. Officials reported that the connection was utilizing a 16-kilowatt load and had a 25-kVA transformer installed.

During the inspection, authorities found that the hostel consisted of13 rooms and one store room. LESCO officials said evidence has been collected and further legal and departmental action has been initiated against the owners of the building.

In another operation, the M&T Kasur team conducted an inspection in the Phool Nagar subdivision, where a tube well connection belonging to a consumer identified as Rehmat was checked.

Copyright Business Recorder, 2026

Comments

200 characters remaining