BR100 Decreased By (-0.4%)
BR30 Decreased By (-0.65%)
KSE100 Decreased By (-0.29%)
KSE30 Decreased By (-0.22%)
AGHA 6.56 Decreased By ▼ -0.11 (-1.65%)
BECO 4.40 Increased By ▲ 0.05 (1.15%)
BML 55.89 Decreased By ▼ -0.28 (-0.5%)
BOP 30.05 Decreased By ▼ -0.07 (-0.23%)
CNERGY 12.75 Decreased By ▼ -0.23 (-1.77%)
CSIL 5.21 Decreased By ▼ -0.10 (-1.88%)
FCCL 51.00 Decreased By ▼ -0.65 (-1.26%)
FFL 14.43 Decreased By ▼ -0.06 (-0.41%)
FNEL 1.22 Increased By ▲ 0.01 (0.83%)
KEL 5.97 Decreased By ▼ -0.09 (-1.49%)
KOSM 5.58 Decreased By ▼ -0.26 (-4.45%)
LOTCHEM 26.15 Decreased By ▼ -0.02 (-0.08%)
MLCF 90.33 Decreased By ▼ -0.90 (-0.99%)
NBP 161.45 Decreased By ▼ -2.74 (-1.67%)
NCPL 52.55 Decreased By ▼ -0.63 (-1.18%)
NPL 57.98 Decreased By ▼ -1.14 (-1.93%)
OGDC 315.40 Increased By ▲ 2.01 (0.64%)
PACE 9.70 Decreased By ▼ -0.07 (-0.72%)
PAEL 34.73 Decreased By ▼ -0.51 (-1.45%)
PIBTL 14.23 Decreased By ▼ -0.48 (-3.26%)
PPL 221.00 Decreased By ▼ -0.36 (-0.16%)
PRL 90.89 Decreased By ▼ -0.33 (-0.36%)
PTC 59.25 Increased By ▲ 0.06 (0.1%)
SSGC 23.39 Increased By ▲ 0.09 (0.39%)
TBL 8.65 Decreased By ▼ -0.10 (-1.14%)
TELE 7.40 Decreased By ▼ -0.21 (-2.76%)
TPL 21.00 Decreased By ▼ -1.03 (-4.68%)
TPLP 12.02 Decreased By ▼ -0.54 (-4.3%)
TREET 21.33 Decreased By ▼ -0.40 (-1.84%)
TRG 54.35 Decreased By ▼ -1.44 (-2.58%)

ISLAMABAD: Pakistan has secured a major financial success in the CASA-1000 project, saving over USD 27 million after successfully negotiating down contractor claims.

According to the Power Division, the EPC Contractor, M/s Hitachi–Cobra JV, had escalated its Care & Custody claim to approximately USD 32.9 million for Pakistan and USD 28.5 million for Tajikistan.

A high-level meeting held from 9–10 March 2026 in Ludvika, Sweden, with participation of the Additional Secretary, Ministry of Energy (Power Division), Syed Imtiaz Hussain Shah, and the Managing Director, National Grid Company (NGC), Altaf Hussain led to successful negotiations.

READ MORE: Zardari, Kyrgyz president pledge to expedite CASA-1000 project

The parties agreed to cap the total Care & Custody cost at USD 9.0 million (shared between Pakistan and Tajikistan) up to February 2028, resulting in savings of over USD 27 million for Pakistan, while ensuring the health, integrity, and operational readiness of critical HVDC assets during the interim period. A limited extension of up to three months beyond February 2028 has also been agreed upon, if required, subject to 5% monthly escalation.

The CASA-1000 Project, linking Central Asia with South Asia for electricity trade, has faced delays due to geo political situation in Afghanistan. Consequently, commissioning of the HVDC system is now expected by September 2027, requiring interim Care & Custody arrangements.

Copyright Business Recorder, 2026

Comments

Comments are closed for this article.