BR100 Increased By (0.18%)
BR30 Decreased By (-0.03%)
KSE100 Increased By (0.16%)
KSE30 Increased By (0.26%)
BECO 5.58 Decreased By ▼ -0.07 (-1.24%)
BML 61.22 Decreased By ▼ -2.66 (-4.16%)
BOP 33.68 Increased By ▲ 0.01 (0.03%)
CNERGY 8.08 Decreased By ▼ -0.06 (-0.74%)
DCL 11.64 Increased By ▲ 0.26 (2.28%)
FCCL 52.14 Decreased By ▼ -0.13 (-0.25%)
FCSC 5.63 Increased By ▲ 0.13 (2.36%)
FFL 18.01 Increased By ▲ 0.29 (1.64%)
FNEL 1.35 Increased By ▲ 0.04 (3.05%)
HUMNL 11.04 Decreased By ▼ -0.14 (-1.25%)
KEL 7.84 Decreased By ▼ -0.02 (-0.25%)
KOSM 5.73 Increased By ▲ 0.09 (1.6%)
MLCF 86.51 Increased By ▲ 0.91 (1.06%)
NBP 184.30 Increased By ▲ 0.68 (0.37%)
PACE 11.65 Decreased By ▼ -0.03 (-0.26%)
PAEL 39.96 Decreased By ▼ -0.31 (-0.77%)
PIAHCLA 25.67 Decreased By ▼ -0.13 (-0.5%)
PIBTL 17.27 Increased By ▲ 0.23 (1.35%)
PPL 222.67 Decreased By ▼ -1.39 (-0.62%)
PRL 34.46 Decreased By ▼ -0.16 (-0.46%)
PTC 63.74 Decreased By ▼ -0.25 (-0.39%)
SEARL 90.46 Increased By ▲ 0.37 (0.41%)
SSGC 26.67 Increased By ▲ 0.07 (0.26%)
TELE 8.91 Decreased By ▼ -0.17 (-1.87%)
THCCL 68.47 Increased By ▲ 1.11 (1.65%)
TPLP 11.20 Decreased By ▼ -0.22 (-1.93%)
TREET 24.70 Decreased By ▼ -0.01 (-0.04%)
TRG 70.59 Decreased By ▼ -0.39 (-0.55%)
WAVES 11.11 Increased By ▲ 0.13 (1.18%)
WTL 1.27 Increased By ▲ 0.01 (0.79%)

KARACHI: Sindh Engro Coal Mining Company (SECMC) and Meezan Bank Limited signed an Islamic Facility Agreement to fund the Phase III mine expansion project of the Thar Block II.

Under this arrangement, syndicate comprising of United Bank Limited, Askari Bank Limited, Sindh Bank Limited and Pak China Investment Company Limited led by Meezan Bank Limited will provide Islamic financing to scale up the coal production from the current 7.6 million tons per annum (MTPA) to 11.2 MTPA.

Under the continued leadership of the Government of Sindh, SECMC’s historic journey began in 2019 when it became the country’s first public-private partnership to demonstrate the commercial viability of Thar coal for power generation.

In 2022, SECMC expanded its operations to 7.6 MTPA taking total a power generation from Thar Block II to 1320 MW, and now, with Phase III underway, it aims to further strengthen Pakistan’s energy security by converting 660 MW Lucky Electric Power Company Limited (LEPCL) power plant to Thar Coal.

Speaking on the occasion, Amir Iqbal, CEO of SECMC, acknowledged the support of the Government of Sindh, Meezan Bank, and all stakeholders involved. He said, “The Thar Block II development started as a bold idea and proved that indigenous coal could energize Pakistan. This financing and continued relationship with Meezan and other members of the syndicate takes us closer to our Phase III goal and brings us a step further in delivering low-cost electricity through domestic resources.”

He added, “It also marks as a significant milestone in SECMC’s vision to energize Pakistan’s future through world-class, sustainable mining.”

Currently the SECMC is energizing over 3 million households and have contributed to foreign exchange savings of approximately USD 1.6 billion since inception. Thar Coal Power plants’ consistent ranking are among the top positions on the Economic merit order issued by National Transmission & Despatch Company (NTDC) makes Thar coal as the most cost-effective baseload fuel in the country.

Copyright Business Recorder, 2025

Comments

Comments are closed for this article.