BR100 Increased By (0.11%)
BR30 Decreased By (-0.26%)
KSE100 Increased By (0.12%)
KSE30 Increased By (0.09%)
AGHA 7.79 Increased By ▲ 0.04 (0.52%)
BECO 5.23 Increased By ▲ 0.04 (0.77%)
BML 57.26 Decreased By ▼ -1.40 (-2.39%)
BOP 34.10 Increased By ▲ 0.41 (1.22%)
CNERGY 9.92 Decreased By ▼ -0.69 (-6.5%)
CSIL 5.35 Increased By ▲ 0.05 (0.94%)
FCCL 54.61 Increased By ▲ 0.87 (1.62%)
FFL 16.70 Increased By ▲ 0.24 (1.46%)
FNEL 1.24 Increased By ▲ 0.02 (1.64%)
KEL 7.42 Increased By ▲ 0.14 (1.92%)
KOSM 5.75 Increased By ▲ 0.11 (1.95%)
LOTCHEM 29.35 Decreased By ▼ -0.30 (-1.01%)
MLCF 94.35 Decreased By ▼ -2.01 (-2.09%)
NBP 202.70 Decreased By ▼ -0.83 (-0.41%)
NCPL 57.00 Increased By ▲ 0.15 (0.26%)
NPL 67.78 Increased By ▲ 0.47 (0.7%)
OGDC 316.40 Decreased By ▼ -1.82 (-0.57%)
PACE 10.64 Increased By ▲ 0.01 (0.09%)
PAEL 43.15 Increased By ▲ 1.38 (3.3%)
PIBTL 16.72 Decreased By ▼ -0.09 (-0.54%)
PPL 220.50 Increased By ▲ 0.33 (0.15%)
PRL 49.05 No Change ▼ 0.00 (0%)
PTC 70.98 Increased By ▲ 0.97 (1.39%)
SSGC 28.17 Decreased By ▼ -0.97 (-3.33%)
TBL 9.90 Increased By ▲ 0.13 (1.33%)
TELE 8.80 Decreased By ▼ -0.02 (-0.23%)
TPL 18.14 Increased By ▲ 0.97 (5.65%)
TPLP 13.40 Increased By ▲ 0.89 (7.11%)
TREET 22.75 Increased By ▲ 0.16 (0.71%)
TRG 60.30 Increased By ▲ 0.08 (0.13%)
By

KARACHI: K-Electric (KE), in collaboration with law enforcement agencies, is conducting operations against electricity theft and defaulters across the megacity.

KE had removed its 250-kva PMT installed in Ittehad Town, Baldia due to non-payment of dues. However, later, anti-social elements not only illegally installed a 500-kva PMT transformer but also reconnected it to K-Electric’s network and continued the electricity theft.

This illegal PMT was removed with re-disconnection, on which the total outstanding amount was PKR 67 million.

K-Electric had earlier disconnected its transformer at the same location on the basis of dues of over Rs 60 million; however, the defaulters, who had not made payments since 2023, illegally reconnected to the network and continued to steal electricity.

A KE spokesperson said that operations are under way against electricity thieves in various areas including Malir, Landhi, Korangi, Surjani Town, and Gulistan-e-Jauhar.

On the other hand, KE has taken an important step towards providing reliable and continuous power supply in the area by inaugurating a new feeder in the Marble Industry Area. This new feeder will not only provide better power supply to the existing industries but also to the new entrepreneurs.

Comments

Comments are closed for this article.