AIRLINK 75.60 Increased By ▲ 0.35 (0.47%)
BOP 5.12 Increased By ▲ 0.01 (0.2%)
CNERGY 4.48 Decreased By ▼ -0.12 (-2.61%)
DFML 33.17 Increased By ▲ 0.64 (1.97%)
DGKC 90.40 Increased By ▲ 0.05 (0.06%)
FCCL 22.85 Decreased By ▼ -0.13 (-0.57%)
FFBL 33.30 Decreased By ▼ -0.27 (-0.8%)
FFL 10.04 No Change ▼ 0.00 (0%)
GGL 11.25 Increased By ▲ 0.20 (1.81%)
HBL 115.28 Increased By ▲ 0.38 (0.33%)
HUBC 136.62 Decreased By ▼ -0.72 (-0.52%)
HUMNL 9.54 Increased By ▲ 0.01 (0.1%)
KEL 4.64 Decreased By ▼ -0.02 (-0.43%)
KOSM 4.69 Decreased By ▼ -0.01 (-0.21%)
MLCF 40.70 Increased By ▲ 0.16 (0.39%)
OGDC 140.15 Increased By ▲ 0.40 (0.29%)
PAEL 28.10 Increased By ▲ 0.45 (1.63%)
PIAA 25.05 Increased By ▲ 0.65 (2.66%)
PIBTL 6.95 Increased By ▲ 0.03 (0.43%)
PPL 124.95 Decreased By ▼ -0.35 (-0.28%)
PRL 27.45 Decreased By ▼ -0.10 (-0.36%)
PTC 14.16 Increased By ▲ 0.01 (0.07%)
SEARL 63.15 Increased By ▲ 1.30 (2.1%)
SNGP 72.90 Decreased By ▼ -0.08 (-0.11%)
SSGC 10.50 Decreased By ▼ -0.09 (-0.85%)
TELE 8.74 Decreased By ▼ -0.04 (-0.46%)
TPLP 11.69 Decreased By ▼ -0.04 (-0.34%)
TRG 67.20 Increased By ▲ 0.60 (0.9%)
UNITY 25.43 Increased By ▲ 0.28 (1.11%)
WTL 1.42 Decreased By ▼ -0.02 (-1.39%)
BR100 7,841 Increased By 38.1 (0.49%)
BR30 25,827 Increased By 11.4 (0.04%)
KSE100 74,910 Increased By 379 (0.51%)
KSE30 24,094 Increased By 139.4 (0.58%)

FAISALABAD: Punjab Power Transmission landscape went through a monumental transformation as a result of the Japan International Cooperation Agency’s (JICA) pivotal project.

Marking a historic milestone, the inauguration of the 500kV Grid Station and its associated transmission lines stands as a testament to the unwavering commitment of JICA and the support of the Government of Japan.

With a substantial Japanese ODA loan amounting to Japanese Yen 11,943,000,000, JICA’s collaboration with the National Transmission and Despatch Company (NTDC) Pakistan has paved the way for a revolutionary enhancement of the power infrastructure in different cities of Punjab including Faisalabad West grid station.

This transformative project has been carefully designed to fortify the power supply to Faisalabad by significantly reducing outages and voltage fluctuations, ultimately enhancing the reliability and quality of the power distribution network.

The completion of the 500kV Grid Station and its associated transmission lines reflects JICA’s steadfast dedication to bolstering Pakistan’s infrastructure while fostering sustainable socio-economic development. By harnessing advanced technology and best practices, JICA’s support has enabled NTDC Pakistan to embrace a new era of power management with heightened efficacy and resilience.

The successful realization of this project is a reflection of the steadfast commitment of both JICA and the Government of Japan in bolstering the critical infrastructure of Faisalabad West. This achievement marks a pivotal milestone in the region’s quest for a more resilient and efficient power system, heralding a brighter and sustainable future.

A joint effort between JICA Pakistan office and NTDC culminated in a media tour to the Faisalabad West Grid Station on Tuesday, where representatives from print and electronic media outlets embarked on a site visit. The NTDC team provided comprehensive briefings on the technical intricacies of the project, followed by an insightful on-site exploration.

The Faisalabad West 500kV Grid Station and its associated transmission lines are integral components of the Japanese ODA loan-funded “Punjab Transmission Lines and Grid Station Project(I) PK-P58,” amounting to Japanese Yen 11,943,000,000/. Other components of this project include the construction of the 500kV Rahim Yar Khan Grid Station and associated transmission lines, as well as the 220kV Shalamar (GIS) Grid Station and transmission lines in Lahore.

Copyright Business Recorder, 2024

Comments

Comments are closed.