BR100 Decreased By (-0.07%)
BR30 Decreased By (-0.03%)
KSE100 Increased By (0.05%)
KSE30 Increased By (0.06%)
AGHA 6.65 Decreased By ▼ -0.02 (-0.3%)
BECO 4.36 Increased By ▲ 0.01 (0.23%)
BML 56.31 Increased By ▲ 0.14 (0.25%)
BOP 30.10 Decreased By ▼ -0.02 (-0.07%)
CNERGY 12.90 Decreased By ▼ -0.08 (-0.62%)
CSIL 5.30 Decreased By ▼ -0.01 (-0.19%)
FCCL 51.70 Increased By ▲ 0.05 (0.1%)
FFL 14.49 No Change ▼ 0.00 (0%)
FNEL 1.22 Increased By ▲ 0.01 (0.83%)
KEL 6.03 Decreased By ▼ -0.03 (-0.5%)
KOSM 5.86 Increased By ▲ 0.02 (0.34%)
LOTCHEM 26.52 Increased By ▲ 0.35 (1.34%)
MLCF 91.25 Increased By ▲ 0.02 (0.02%)
NBP 164.00 Decreased By ▼ -0.19 (-0.12%)
NCPL 53.09 Decreased By ▼ -0.09 (-0.17%)
NPL 58.48 Decreased By ▼ -0.64 (-1.08%)
OGDC 314.00 Increased By ▲ 0.61 (0.19%)
PACE 9.77 No Change ▼ 0.00 (0%)
PAEL 35.16 Decreased By ▼ -0.08 (-0.23%)
PIBTL 14.69 Decreased By ▼ -0.02 (-0.14%)
PPL 220.27 Decreased By ▼ -1.09 (-0.49%)
PRL 91.55 Increased By ▲ 0.33 (0.36%)
PTC 59.49 Increased By ▲ 0.30 (0.51%)
SSGC 23.34 Increased By ▲ 0.04 (0.17%)
TBL 8.73 Decreased By ▼ -0.02 (-0.23%)
TELE 7.61 No Change ▼ 0.00 (0%)
TPL 22.00 Decreased By ▼ -0.03 (-0.14%)
TPLP 12.60 Increased By ▲ 0.04 (0.32%)
TREET 21.80 Increased By ▲ 0.07 (0.32%)
TRG 55.85 Increased By ▲ 0.06 (0.11%)

LAHORE: Construction work is under progress on 12 different sites of Dasu Hydropower Project. The critical diversion system will be completed in May this year, while electricity generation will commence by the end of 2026.

The project management briefed Chairman Wapda Lt-Gen Sajjad Ghani (retd) during his visit to Dasu Hydropower Project which is being constructed by Wapda on River Indus upstream of Dasu Town in Upper Kohistan district of Khyber Pakhtunkhwa.

The Chairman visited various sites of the project including diversion tunnels, dam area and the project colony. He was accompanied by the Commissioner Hazara Division. The GM and PD Dasu Hydropower Project and representatives of the consultants and the contractors were also present on the occasion.

During his visit to the project colony, the Chairman inaugurated the newly-constructed office building of the project. He also had a meeting with grand jirga, comprising elders and notables of Kohistan region. Interacting with the jirga members, the Chairman said that the agreement, signed among the United Kohistan Jirga, civil administration and Wapda last month, will prove beneficial for both locals of the area and the project.

It is worth mentioning that the 4320 MW-Dasu Hydropower Project is planned to be completed in two stages. At present, Wapda is constructing stage-I with installed generation capacity of 2160 MW and annual energy generation of 12 billion units of low-cost and environment-friendly electricity.

The stage-II, when implemented, will also provide 9 billion units to the national grid. On completion of the both stages, Dasu will become the project with the highest annual energy generation in Pakistan i.e., 21 billion units on the average.

Wapda is spending Rs 17.34 billion on the schemes relating to resettlement, environmental management and social development in the project area. About 3722 jobs, including 1945 for locals, have so far been created, which will increase to 8,000 mark during peak construction period of the project.

Copyright Business Recorder, 2023

Comments

Comments are closed for this article.