BR100 Increased By (0.64%)
BR30 Increased By (0.86%)
KSE100 Increased By (0.45%)
KSE30 Increased By (0.46%)
BECO 6.10 Increased By ▲ 0.33 (5.72%)
BML 52.70 Decreased By ▼ -0.30 (-0.57%)
BOP 34.34 Increased By ▲ 0.35 (1.03%)
CNERGY 8.15 Increased By ▲ 0.04 (0.49%)
DCL 12.23 Increased By ▲ 0.03 (0.25%)
FCCL 53.49 Increased By ▲ 0.66 (1.25%)
FCSC 5.15 Increased By ▲ 0.08 (1.58%)
FFL 18.05 Increased By ▲ 0.10 (0.56%)
FNEL 1.31 Increased By ▲ 0.02 (1.55%)
HUMNL 10.94 Increased By ▲ 0.06 (0.55%)
KEL 8.14 Increased By ▲ 0.12 (1.5%)
KOSM 5.32 Decreased By ▼ -0.20 (-3.62%)
MLCF 87.00 Increased By ▲ 0.49 (0.57%)
NBP 187.15 Increased By ▲ 1.99 (1.07%)
PACE 10.60 Increased By ▲ 0.02 (0.19%)
PAEL 39.90 Increased By ▲ 0.48 (1.22%)
PIAHCLA 26.18 Decreased By ▼ -0.04 (-0.15%)
PIBTL 17.27 Increased By ▲ 0.60 (3.6%)
PPL 229.35 Increased By ▲ 1.17 (0.51%)
PRL 34.80 Increased By ▲ 0.12 (0.35%)
PTC 66.79 Increased By ▲ 1.46 (2.23%)
SEARL 90.65 Increased By ▲ 0.52 (0.58%)
SSGC 27.21 Increased By ▲ 0.61 (2.29%)
TELE 8.55 Increased By ▲ 0.27 (3.26%)
THCCL 58.22 Decreased By ▼ -0.28 (-0.48%)
TPLP 8.62 Increased By ▲ 0.40 (4.87%)
TREET 24.56 Increased By ▲ 0.03 (0.12%)
TRG 69.69 Decreased By ▼ -0.02 (-0.03%)
WAVES 9.98 Increased By ▲ 0.04 (0.4%)
WTL 1.29 Increased By ▲ 0.01 (0.78%)

ISLAMABAD: On the directions of Minister of State Dr Musadik Malik, the secretary petroleum is spearheading resolution of gas low pressure issue in areas under the jurisdiction of the SNGPL in close coordination with management of the company.

Ali J Hamdani, Managing Director SNGPL has been monitoring the supply data in real-time.

The constant monitoring and feedback system in place at Gas House has resulted in resolution of years old chronic issues of low pressure.

The SNGPL has completed and commissioned 10” dia X 9 km gas pipeline from Ura Chowk to Chak Mandhar Sialkot and 8” dia X 3-Km pipeline from Chak Mandhar to Kharota Syedan Chowk, Sialkot. The cost incurred on this project is Rs 133 million. Resultantly, around 34,000 consumers, residing in more than 100 villages along Gondal road, Saidpur, Chaprar road, and Head Marala road will be facilitated through this project.

Similarly, to address the issues of consumer base along Adyala Road Rawalpindi, the SNGPL has laid and commissioned 10” dia X 17.65 km gas pipeline for system improvement.

The cost incurred on this project is Rs 204 million.

Resultantly, around 25,000 consumers, along Adyala Road will be facilitated through this project. By the completion of this project earlier this week, the long standing gas pressure issues of Gorakhpur, Khasala Khurd, Khasala Kalan, Dhagal, Shahpur, Adyala jail, DhokPharian, Munawar Colony, Kekhashan Colony, Gulshan Abad, and adjoining localities have been resolved and residents of the said areas will now get adequate gas supplies.

Copyright Business Recorder, 2022

Comments

Comments are closed for this article.