BR100 Decreased By (-0.02%)
BR30 Decreased By (-0.34%)
KSE100 Decreased By (-0.03%)
KSE30 Decreased By (-0.01%)
AGHA 6.74 Increased By ▲ 0.06 (0.9%)
BECO 4.37 No Change ▼ 0.00 (0%)
BML 57.00 Decreased By ▼ -0.32 (-0.56%)
BOP 30.35 No Change ▼ 0.00 (0%)
CNERGY 13.07 Decreased By ▼ -0.05 (-0.38%)
CSIL 5.40 Decreased By ▼ -0.01 (-0.18%)
FCCL 52.70 Decreased By ▼ -0.09 (-0.17%)
FFL 14.59 Decreased By ▼ -0.13 (-0.88%)
FNEL 1.13 Increased By ▲ 0.01 (0.89%)
KEL 6.17 Increased By ▲ 0.08 (1.31%)
KOSM 6.07 Increased By ▲ 0.34 (5.93%)
LOTCHEM 26.50 Increased By ▲ 0.04 (0.15%)
MLCF 92.99 Decreased By ▼ -0.17 (-0.18%)
NBP 164.90 Increased By ▲ 0.24 (0.15%)
NCPL 55.52 Decreased By ▼ -0.14 (-0.25%)
NPL 60.70 Decreased By ▼ -0.46 (-0.75%)
OGDC 315.75 Decreased By ▼ -0.98 (-0.31%)
PACE 9.95 Increased By ▲ 0.08 (0.81%)
PAEL 35.60 Decreased By ▼ -0.03 (-0.08%)
PIBTL 14.79 Increased By ▲ 0.11 (0.75%)
PPL 223.90 Decreased By ▼ -3.01 (-1.33%)
PRL 92.66 Decreased By ▼ -0.36 (-0.39%)
PTC 60.35 Increased By ▲ 0.09 (0.15%)
SSGC 23.75 Decreased By ▼ -0.06 (-0.25%)
TBL 8.80 Increased By ▲ 0.05 (0.57%)
TELE 7.78 Decreased By ▼ -0.02 (-0.26%)
TPL 22.34 Decreased By ▼ -0.01 (-0.04%)
TPLP 12.76 Decreased By ▼ -0.21 (-1.62%)
TREET 22.10 Decreased By ▼ -0.06 (-0.27%)
TRG 56.75 Increased By ▲ 0.19 (0.34%)

KARACHI: Pak Sarzameen Party (PSP) Chairman Syed Mustafa Kamal on Sunday said that if Karachi gives mandate to PSP, it will ensure immediate supply of 640 million cusecs of water by completely dismantling hydrant mafia.

Simultaneously, PSP will complete mega water project K-IV and start work on K-V.

He expressed these views while addressing a public meeting in Baldia Town.

In 2008, “I had handed over the land to the Karachi Water Board for water line projects for up to 50 years of Karachi’s needs, and kicked-off K-IV project,” he claimed.

Kamal released a road map to ensure the supply of drinking water to Karachi.

He further said that when the population of Karachi was 20 million, 1200 million cusecs of water was required. But, now 1500 million cusecs of water is required for more than 30 million population.

K-IV has not been completed till date by PPP because of its incompetence and bias.

When projects are not completed on time their costs continue to rise, which directly impact our economy. Unfortunately our so called leaders lack national approach. Due to their narrow mindedness, the landlords of the People’s Party have destroyed the province of Sindh and caused irreparable damage to the country economically.

During my regime as City Nazim, no one dared to build hydrants on water lines. Still only we can shut down the hydrants on the water lines.

We are the only doctors of this city and it’s only us who know how to fix economic hub of Pakistan.

Copyright Business Recorder, 2022

Comments

Comments are closed for this article.