BR100 Decreased By (-0.98%)
BR30 Decreased By (-0.58%)
KSE100 Decreased By (-0.97%)
KSE30 Decreased By (-1.07%)
AGHA 7.70 Decreased By ▼ -0.11 (-1.41%)
BECO 5.16 Decreased By ▼ -0.05 (-0.96%)
BML 56.60 Decreased By ▼ -0.90 (-1.57%)
BOP 33.82 Decreased By ▼ -0.21 (-0.62%)
CNERGY 9.95 Decreased By ▼ -0.01 (-0.1%)
CSIL 5.30 Decreased By ▼ -0.01 (-0.19%)
FCCL 53.07 Decreased By ▼ -1.63 (-2.98%)
FFL 16.58 Decreased By ▼ -0.11 (-0.66%)
FNEL 1.22 Decreased By ▼ -0.01 (-0.81%)
KEL 7.27 Decreased By ▼ -0.13 (-1.76%)
KOSM 5.73 Decreased By ▼ -0.04 (-0.69%)
LOTCHEM 29.55 Increased By ▲ 0.23 (0.78%)
MLCF 92.90 Decreased By ▼ -1.46 (-1.55%)
NBP 202.00 Decreased By ▼ -1.05 (-0.52%)
NCPL 56.84 Decreased By ▼ -0.16 (-0.28%)
NPL 66.62 Decreased By ▼ -1.08 (-1.6%)
OGDC 318.98 Increased By ▲ 3.14 (0.99%)
PACE 10.55 Decreased By ▼ -0.09 (-0.85%)
PAEL 42.31 Decreased By ▼ -0.89 (-2.06%)
PIBTL 16.39 Decreased By ▼ -0.35 (-2.09%)
PPL 218.50 Decreased By ▼ -1.28 (-0.58%)
PRL 51.20 Increased By ▲ 2.01 (4.09%)
PTC 70.00 Decreased By ▼ -0.53 (-0.75%)
SSGC 26.96 Decreased By ▼ -1.29 (-4.57%)
TBL 9.75 Decreased By ▼ -0.11 (-1.12%)
TELE 8.68 Decreased By ▼ -0.11 (-1.25%)
TPL 17.99 Decreased By ▼ -0.25 (-1.37%)
TPLP 13.44 Increased By ▲ 0.17 (1.28%)
TREET 22.55 Decreased By ▼ -0.17 (-0.75%)
TRG 59.48 Decreased By ▼ -0.66 (-1.1%)
By

HUB: The National Highways Authority (NHA) has said that the Hub River Bridge has been demolished due to heavy rains and flash floods and the Hub bypass is being used as an alternative.

According to an NHA spokesperson, the land connection between Sindh and Balochistan has not been cut as the Hub Bypass is being used as an alternative to the demolished Hub flyover.

He said Hub bypass is 11-km long and extends from Berout to the national highway. Officials have started consultations regarding the rebuilding of the Hub flyover, he added. The heavy rains are causing abnormal discharge of water from the Hub dam spillways, due to which local government has to impose an emergency in the area.

The overflow of water from the Hub dam is more than the capacity of the new bridge built near the Murad dam construction site, a media report states. The excess water overflows from the bridge, cuts the road, and then falls into the river, it added.

Comments

Comments are closed for this article.