BR100 Decreased By (-0.05%)
BR30 Decreased By (-0.29%)
KSE100 Decreased By (-0.01%)
KSE30 Decreased By (-0.01%)
AGHA 6.71 Increased By ▲ 0.03 (0.45%)
BECO 4.41 Increased By ▲ 0.04 (0.92%)
BML 57.44 Increased By ▲ 0.12 (0.21%)
BOP 30.33 Decreased By ▼ -0.02 (-0.07%)
CNERGY 13.15 Increased By ▲ 0.03 (0.23%)
CSIL 5.37 Decreased By ▼ -0.04 (-0.74%)
FCCL 52.78 Decreased By ▼ -0.01 (-0.02%)
FFL 14.71 Decreased By ▼ -0.01 (-0.07%)
FNEL 1.12 No Change ▼ 0.00 (0%)
KEL 6.10 Increased By ▲ 0.01 (0.16%)
KOSM 6.17 Increased By ▲ 0.44 (7.68%)
LOTCHEM 26.52 Increased By ▲ 0.06 (0.23%)
MLCF 93.00 Decreased By ▼ -0.16 (-0.17%)
NBP 164.88 Increased By ▲ 0.22 (0.13%)
NCPL 55.53 Decreased By ▼ -0.13 (-0.23%)
NPL 60.56 Decreased By ▼ -0.60 (-0.98%)
OGDC 315.10 Decreased By ▼ -1.63 (-0.51%)
PACE 9.98 Increased By ▲ 0.11 (1.11%)
PAEL 35.60 Decreased By ▼ -0.03 (-0.08%)
PIBTL 14.80 Increased By ▲ 0.12 (0.82%)
PPL 224.77 Decreased By ▼ -2.14 (-0.94%)
PRL 93.15 Increased By ▲ 0.13 (0.14%)
PTC 60.00 Decreased By ▼ -0.26 (-0.43%)
SSGC 23.76 Decreased By ▼ -0.05 (-0.21%)
TBL 8.83 Increased By ▲ 0.08 (0.91%)
TELE 7.88 Increased By ▲ 0.08 (1.03%)
TPL 22.35 No Change ▼ 0.00 (0%)
TPLP 12.81 Decreased By ▼ -0.16 (-1.23%)
TREET 22.10 Decreased By ▼ -0.06 (-0.27%)
TRG 56.55 Decreased By ▼ -0.01 (-0.02%)
By

HUB: The National Highways Authority (NHA) has said that the Hub River Bridge has been demolished due to heavy rains and flash floods and the Hub bypass is being used as an alternative.

According to an NHA spokesperson, the land connection between Sindh and Balochistan has not been cut as the Hub Bypass is being used as an alternative to the demolished Hub flyover.

He said Hub bypass is 11-km long and extends from Berout to the national highway. Officials have started consultations regarding the rebuilding of the Hub flyover, he added. The heavy rains are causing abnormal discharge of water from the Hub dam spillways, due to which local government has to impose an emergency in the area.

The overflow of water from the Hub dam is more than the capacity of the new bridge built near the Murad dam construction site, a media report states. The excess water overflows from the bridge, cuts the road, and then falls into the river, it added.

Comments

Comments are closed for this article.