AIRLINK 74.10 Decreased By ▼ -0.46 (-0.62%)
BOP 5.01 Decreased By ▼ -0.05 (-0.99%)
CNERGY 4.46 No Change ▼ 0.00 (0%)
DFML 41.60 Increased By ▲ 1.87 (4.71%)
DGKC 87.19 Decreased By ▼ -0.36 (-0.41%)
FCCL 21.80 Decreased By ▼ -0.13 (-0.59%)
FFBL 34.20 Decreased By ▼ -0.39 (-1.13%)
FFL 9.95 Increased By ▲ 0.20 (2.05%)
GGL 10.45 Decreased By ▼ -0.04 (-0.38%)
HBL 113.61 Decreased By ▼ -0.18 (-0.16%)
HUBC 136.00 Decreased By ▼ -0.52 (-0.38%)
HUMNL 11.90 Increased By ▲ 1.00 (9.17%)
KEL 4.84 Increased By ▲ 0.17 (3.64%)
KOSM 4.58 Decreased By ▼ -0.06 (-1.29%)
MLCF 38.32 Decreased By ▼ -0.14 (-0.36%)
OGDC 135.70 Decreased By ▼ -0.44 (-0.32%)
PAEL 26.75 Increased By ▲ 0.14 (0.53%)
PIAA 20.80 Decreased By ▼ -1.69 (-7.51%)
PIBTL 6.75 Increased By ▲ 0.08 (1.2%)
PPL 122.42 Increased By ▲ 0.13 (0.11%)
PRL 26.84 Decreased By ▼ -0.13 (-0.48%)
PTC 14.65 Increased By ▲ 0.74 (5.32%)
SEARL 59.50 Decreased By ▼ -0.37 (-0.62%)
SNGP 69.98 Decreased By ▼ -0.08 (-0.11%)
SSGC 10.40 Increased By ▲ 0.05 (0.48%)
TELE 8.59 Increased By ▲ 0.05 (0.59%)
TPLP 11.33 Decreased By ▼ -0.01 (-0.09%)
TRG 65.40 Decreased By ▼ -0.60 (-0.91%)
UNITY 26.19 Decreased By ▼ -0.14 (-0.53%)
WTL 1.34 Decreased By ▼ -0.01 (-0.74%)
BR100 7,858 Increased By 33.5 (0.43%)
BR30 25,390 Decreased By -15.8 (-0.06%)
KSE100 75,257 Increased By 173 (0.23%)
KSE30 24,181 Increased By 87.4 (0.36%)

HUB: The National Highways Authority (NHA) has said that the Hub River Bridge has been demolished due to heavy rains and flash floods and the Hub bypass is being used as an alternative.

According to an NHA spokesperson, the land connection between Sindh and Balochistan has not been cut as the Hub Bypass is being used as an alternative to the demolished Hub flyover.

He said Hub bypass is 11-km long and extends from Berout to the national highway. Officials have started consultations regarding the rebuilding of the Hub flyover, he added. The heavy rains are causing abnormal discharge of water from the Hub dam spillways, due to which local government has to impose an emergency in the area.

The overflow of water from the Hub dam is more than the capacity of the new bridge built near the Murad dam construction site, a media report states. The excess water overflows from the bridge, cuts the road, and then falls into the river, it added.

Comments

Comments are closed.