BR100 Increased By (0.11%)
BR30 Decreased By (-0.26%)
KSE100 Increased By (0.12%)
KSE30 Increased By (0.09%)
AGHA 7.79 Increased By ▲ 0.04 (0.52%)
BECO 5.23 Increased By ▲ 0.04 (0.77%)
BML 57.26 Decreased By ▼ -1.40 (-2.39%)
BOP 34.10 Increased By ▲ 0.41 (1.22%)
CNERGY 9.92 Decreased By ▼ -0.69 (-6.5%)
CSIL 5.35 Increased By ▲ 0.05 (0.94%)
FCCL 54.61 Increased By ▲ 0.87 (1.62%)
FFL 16.70 Increased By ▲ 0.24 (1.46%)
FNEL 1.24 Increased By ▲ 0.02 (1.64%)
KEL 7.42 Increased By ▲ 0.14 (1.92%)
KOSM 5.75 Increased By ▲ 0.11 (1.95%)
LOTCHEM 29.35 Decreased By ▼ -0.30 (-1.01%)
MLCF 94.35 Decreased By ▼ -2.01 (-2.09%)
NBP 202.70 Decreased By ▼ -0.83 (-0.41%)
NCPL 57.00 Increased By ▲ 0.15 (0.26%)
NPL 67.78 Increased By ▲ 0.47 (0.7%)
OGDC 316.40 Decreased By ▼ -1.82 (-0.57%)
PACE 10.64 Increased By ▲ 0.01 (0.09%)
PAEL 43.15 Increased By ▲ 1.38 (3.3%)
PIBTL 16.72 Decreased By ▼ -0.09 (-0.54%)
PPL 220.50 Increased By ▲ 0.33 (0.15%)
PRL 49.05 No Change ▼ 0.00 (0%)
PTC 70.98 Increased By ▲ 0.97 (1.39%)
SSGC 28.17 Decreased By ▼ -0.97 (-3.33%)
TBL 9.90 Increased By ▲ 0.13 (1.33%)
TELE 8.80 Decreased By ▼ -0.02 (-0.23%)
TPL 18.14 Increased By ▲ 0.97 (5.65%)
TPLP 13.40 Increased By ▲ 0.89 (7.11%)
TREET 22.75 Increased By ▲ 0.16 (0.71%)
TRG 60.30 Increased By ▲ 0.08 (0.13%)

ISLAMABAD: Former prime minister Shahid Khaqan Abbasi said on Monday that load-shedding in the country would be reduced to three and half hours from today (Tuesday).

Addressing a news conference along with Minister for Power Khurram Dastgir and Minister of State for Petroleum Musadiq Malik, he held the previous government responsible for the load-shedding and stated that neither any new power plant was set up nor a single megawatt of electricity was added by them in the system.

Abbasi said that for the last few days, the government’s focus was on electricity and he wanted to place some facts before the people. He said that today electricity demand has increased 25,000 MW due to the heat wave.

Finance minister assures payment of Rs40.5bn refund claims of DLTL

The fuel- coal, diesel, LNG and furnace oil- was available in the country to produce 17,000-18,000 MW when the present government assumed the power. We have increased it more than 21,000 MW. During the last three days and today there is a shortage of 4,000MW which required four hours load shedding to bridge the demand and supply.

Besides, he said that other sectors, fertiliser and the export sector was provided.

He said that from 16th June load shedding would be reduce to three hours and after June 30, load shedding would be reduce to one and half hours.

The former prime minister said that we accept the situation inherited as a challenge and will try to resolve them.

He said that two big plants which were to produce cheapest electricity and were to be completed in 2019-20 have not been completed. He said that the previous government neither set up any new power plant nor a single unit was produced.

Copyright Business Recorder, 2022

Comments

Comments are closed for this article.