AIRLINK 65.20 Decreased By ▼ -0.70 (-1.06%)
BOP 5.57 Decreased By ▼ -0.12 (-2.11%)
CNERGY 4.56 Decreased By ▼ -0.09 (-1.94%)
DFML 24.52 Increased By ▲ 1.67 (7.31%)
DGKC 69.96 Decreased By ▼ -0.74 (-1.05%)
FCCL 20.30 Decreased By ▼ -0.05 (-0.25%)
FFBL 29.11 No Change ▼ 0.00 (0%)
FFL 9.83 Decreased By ▼ -0.10 (-1.01%)
GGL 10.01 Decreased By ▼ -0.07 (-0.69%)
HBL 114.25 Decreased By ▼ -1.00 (-0.87%)
HUBC 129.10 Decreased By ▼ -0.40 (-0.31%)
HUMNL 6.71 Increased By ▲ 0.01 (0.15%)
KEL 4.44 Increased By ▲ 0.06 (1.37%)
KOSM 4.89 Decreased By ▼ -0.13 (-2.59%)
MLCF 37.00 Increased By ▲ 0.04 (0.11%)
OGDC 132.30 Increased By ▲ 1.10 (0.84%)
PAEL 22.54 Increased By ▲ 0.06 (0.27%)
PIAA 25.89 Decreased By ▼ -0.41 (-1.56%)
PIBTL 6.60 Increased By ▲ 0.07 (1.07%)
PPL 112.85 Increased By ▲ 0.73 (0.65%)
PRL 29.41 Increased By ▲ 1.02 (3.59%)
PTC 15.24 Decreased By ▼ -0.87 (-5.4%)
SEARL 57.03 Decreased By ▼ -1.26 (-2.16%)
SNGP 66.45 Increased By ▲ 0.76 (1.16%)
SSGC 10.98 Decreased By ▼ -0.04 (-0.36%)
TELE 8.80 Decreased By ▼ -0.14 (-1.57%)
TPLP 11.70 Increased By ▲ 0.17 (1.47%)
TRG 68.62 Decreased By ▼ -0.62 (-0.9%)
UNITY 23.40 Decreased By ▼ -0.55 (-2.3%)
WTL 1.38 Increased By ▲ 0.03 (2.22%)
BR100 7,295 Decreased By -9.1 (-0.12%)
BR30 23,854 Decreased By -96 (-0.4%)
KSE100 70,290 Decreased By -43.2 (-0.06%)
KSE30 23,171 Increased By 50.4 (0.22%)

LAHORE: Chairman Pakistan Water and Power Development Authority (WAPDA) Lt-Gen Muzammil Hussain (Retd) has said that Diamer Basha Dam is one of the most significant projects for sustained development in Pakistan as it would provide water for agriculture, mitigate floods and generate low-cost electricity; therefore, concerted efforts are needed on part of all the stakeholders for its scheduled completion in 2028-29.

He said this during his visit to the multi-purpose Diamer Basha Dam to review construction work on the project, being constructed on River Indus 40 kilometers (Km) downstream of Chilas town and 180 Km upstream of Tarbela Dam.

Commander 10 Corps Pakistan Army Lt Gen Sahir Shamshad Mirza also accompanied him during the visit. WAPDA GM Land Accusation & Resettlement Brig Shoaib Taqi (Retd), GM Diamer Basha Dam Project) Muhammad Yousuf Rao and representatives of the Consultants and the contractors were also present.

Referring to the benefits of Diamer Basha Dam, the Chairman WAPDA said that the project will change destiny of the Nation by stabilizing economy and alleviating poverty from the country. He said that the project is also turning out to be a game changer for the locals, as a hefty amount of Rs.78.5 billion is being spent on various development schemes as Confidence Building Measures (CBMs) in the project area.

Commander 10 Corps, addressing on the occasion, said that he is pleased to witness the construction activities on Diamer Basha Dam, which is a project of national importance. Reiterating the support of Pakistan Army for construction of Diamer Basha Dam, he said that "we stand committed to providing safe and secure environment in the project area so as to enable the project management to smoothly continue construction activities on all sites of the project".

Chairman WAPDA, accompanied by Commander 10 Corps, also visited various sites of the project and witnessed construction activities there. Earlier during a briefing about progress on Diamer Basha Dam, the project authorities apprised that at present construction work is being carried out simultaneously on eight different sites including access roads, permanent access bridge across River Indus downstream of the Main Dam, 21 MW-Tangir Hydropower Project, excavation of dam abutment from the top, diversion tunnel, diversion canal, diversion inlet and power intake.

A detailed deliberation was also made about the CBMs being taken by WAPDA for well being of the locals relating to health, education, tourism, and infrastructure development in the project area. More than 16,500 employment opportunities will be created during construction of the project in a phased manner. The people residing in the project area are being given priority for the jobs, as about 3,200 locals have already been employed at the project by WAPDA, the Consultants and the Contractors.

Copyright Business Recorder, 2021

Comments

Comments are closed.