AGL 38.31 Decreased By ▼ -0.52 (-1.34%)
AIRLINK 141.40 Decreased By ▼ -2.00 (-1.39%)
BOP 5.64 Increased By ▲ 0.40 (7.63%)
CNERGY 3.87 Increased By ▲ 0.15 (4.03%)
DCL 7.56 Decreased By ▼ -0.02 (-0.26%)
DFML 47.40 Increased By ▲ 1.00 (2.16%)
DGKC 79.75 Decreased By ▼ -1.13 (-1.4%)
FCCL 27.44 Increased By ▲ 0.02 (0.07%)
FFBL 54.85 Decreased By ▼ -0.15 (-0.27%)
FFL 8.60 Increased By ▲ 0.04 (0.47%)
HUBC 113.51 Increased By ▲ 2.49 (2.24%)
HUMNL 11.20 Decreased By ▼ -0.22 (-1.93%)
KEL 3.99 Increased By ▲ 0.22 (5.84%)
KOSM 8.54 Increased By ▲ 0.21 (2.52%)
MLCF 35.00 Decreased By ▼ -0.20 (-0.57%)
NBP 63.80 Increased By ▲ 2.45 (3.99%)
OGDC 169.40 Decreased By ▼ -2.50 (-1.45%)
PAEL 25.18 Decreased By ▼ -0.60 (-2.33%)
PIBTL 5.89 Decreased By ▼ -0.08 (-1.34%)
PPL 125.75 Decreased By ▼ -1.80 (-1.41%)
PRL 24.79 Decreased By ▼ -0.79 (-3.09%)
PTC 13.26 Increased By ▲ 1.11 (9.14%)
SEARL 57.45 Increased By ▲ 0.45 (0.79%)
TELE 7.12 Increased By ▲ 0.02 (0.28%)
TOMCL 35.00 Increased By ▲ 0.20 (0.57%)
TPLP 7.45 Increased By ▲ 0.50 (7.19%)
TREET 14.32 Increased By ▲ 0.47 (3.39%)
TRG 46.54 Decreased By ▼ -0.51 (-1.08%)
UNITY 26.18 Increased By ▲ 0.13 (0.5%)
WTL 1.20 Decreased By ▼ -0.01 (-0.83%)
BR100 9,091 Decreased By -2.4 (-0.03%)
BR30 27,347 Increased By 28.9 (0.11%)
KSE100 85,669 Increased By 5.3 (0.01%)
KSE30 27,216 Decreased By -224.9 (-0.82%)

HYDERABAD: The Sindh High Court Thursday ordered a builder to bear the cost of repair of 2 bungalows which developed fissures due to construction work at the bordering ground plus 11 commercial building in Qasimabad taluka.

According to details, Hyderabad Circuit Bench comprising justice Nadeem Akhtar and justice Arshad Hussain Khan here ordered the M/S Shams Builders and Developers to implement the order on urgent basis.

On the basis of mutual consensus of the petitioners Manzoor Ali Khan and Saeed Ahmed Waga and the respondent builder, the court assigned the work of assessing the damage caused to the 2 bungalows in Data Nagar Housing scheme to the Structural Engineer Fareed Shaikh.

The court directed Shaikh to complete the assessment work within one week after which the builder would start the repair work in the 2 houses within 7 days.

During the hearing the petitioners' counsel advocate Irfan Qureshi argued that Sindh Building Control Authority (SBCA) had unlawfully approved 11 floors of the building.

He contended that the builder and SBCA had shown a 130 feet wide road whereas the actual size of the road was around 60 feet.

"There are 2 sides of the road divided by the green belt. One side of it along which the Shams Icon is being built is only around 60 feet wide," he added.

The SBCA's Regional Director Naveed Asim apprised the court that the 11-storey commercial building consisted of 3 floors of parking and 8 floors for residential purpose.

Arbab Muhammad Deen Memon, who represented the builder, assured the SHC that they would bear the full cost of repair.

The service charges to the structural engineer would also be paid by the builder.

The matter was adjourned to April 13.

Comments

Comments are closed.