BR100 Increased By (0.44%)
BR30 Increased By (1.39%)
KSE100 Increased By (0.62%)
KSE30 Increased By (0.61%)
BECO 5.49 No Change ▼ 0.00 (0%)
BML 56.00 Decreased By ▼ -0.76 (-1.34%)
BOP 35.41 Increased By ▲ 0.29 (0.83%)
CNERGY 8.20 Increased By ▲ 0.05 (0.61%)
DCL 11.55 Increased By ▲ 0.04 (0.35%)
FCCL 58.15 Increased By ▲ 1.40 (2.47%)
FCSC 5.15 No Change ▼ 0.00 (0%)
FFL 17.90 Increased By ▲ 0.02 (0.11%)
FNEL 1.25 No Change ▼ 0.00 (0%)
HUMNL 11.10 Decreased By ▼ -0.02 (-0.18%)
KEL 8.56 Increased By ▲ 0.14 (1.66%)
KOSM 6.75 Increased By ▲ 0.17 (2.58%)
MLCF 105.65 Increased By ▲ 2.35 (2.27%)
NBP 202.10 Increased By ▲ 1.92 (0.96%)
PACE 11.28 Decreased By ▼ -0.01 (-0.09%)
PAEL 44.42 Increased By ▲ 0.95 (2.19%)
PIAHCLA 28.66 Increased By ▲ 1.17 (4.26%)
PIBTL 18.75 Increased By ▲ 1.05 (5.93%)
PPL 248.10 Increased By ▲ 3.78 (1.55%)
PRL 35.35 Decreased By ▼ -0.08 (-0.23%)
PTC 66.15 Increased By ▲ 0.80 (1.22%)
SEARL 94.95 Increased By ▲ 1.63 (1.75%)
SSGC 32.04 Decreased By ▼ -0.90 (-2.73%)
TELE 8.93 Increased By ▲ 0.02 (0.22%)
THCCL 66.65 Decreased By ▼ -0.07 (-0.1%)
TPLP 10.76 Decreased By ▼ -0.07 (-0.65%)
TREET 25.22 Increased By ▲ 0.10 (0.4%)
TRG 64.21 Decreased By ▼ -0.69 (-1.06%)
WAVES 10.85 Decreased By ▼ -0.08 (-0.73%)
WTL 1.27 Increased By ▲ 0.02 (1.6%)
Business & Finance

Malaysia's Petronas says Baram oil output to resume in Q3 after ship accident

  • Petronas declared force majeure at its Miri crude oil terminal on Oct. 29 as a result of the ship collision on Oct. 27 at the Baram field.
  • Rectification work is currently being carried out at the Baram facilities, which are expected to resume full production in Q3 2021.
Published January 4, 2021 Updated January 4, 2021 05:32pm
By

SINGAPORE: Malaysia's state energy firm Petronas said on Monday it expects to resume full production at its Baram facilities, off the state of Sarawak on Borneo island, in the third quarter after halting output in October following an accident.

Petronas declared force majeure at its Miri crude oil terminal on Oct. 29 as a result of the ship collision on Oct. 27 at the Baram field, a company spokesman told Reuters.

Two crew of the Malaysian offshore support vessel MV Dayang Topaz died after their ship rammed into the Baram B oil platform in bad weather.

"Rectification work is currently being carried out at the Baram facilities, which are expected to resume full production in Q3 2021," it said.

Separately, Petrofac, the operator of the Cendor terminal, offshore Peninsular Malaysia, declared force majeure at the hub on Dec. 4 due to a "technical malfunction", Petronas said.

"An investigation is ongoing and the Cendor terminal is currently on partial production mode," Petronas said, without providing a timeline for when the terminal can resume full output.

Reuters reported on the forces majeures last month.

Comments

Comments are closed for this article.