AIRLINK 71.69 Decreased By ▼ -2.41 (-3.25%)
BOP 5.00 No Change ▼ 0.00 (0%)
CNERGY 4.39 Increased By ▲ 0.05 (1.15%)
DFML 28.55 Decreased By ▼ -0.99 (-3.35%)
DGKC 82.40 Decreased By ▼ -1.15 (-1.38%)
FCCL 21.95 Decreased By ▼ -0.48 (-2.14%)
FFBL 34.15 Decreased By ▼ -0.75 (-2.15%)
FFL 10.08 Increased By ▲ 0.21 (2.13%)
GGL 10.12 Increased By ▲ 0.12 (1.2%)
HBL 113.00 Increased By ▲ 1.00 (0.89%)
HUBC 140.50 Increased By ▲ 2.81 (2.04%)
HUMNL 8.03 Increased By ▲ 1.05 (15.04%)
KEL 4.38 Decreased By ▼ -0.02 (-0.45%)
KOSM 4.50 Decreased By ▼ -0.09 (-1.96%)
MLCF 38.01 Decreased By ▼ -0.54 (-1.4%)
OGDC 134.69 Decreased By ▼ -1.91 (-1.4%)
PAEL 26.62 Increased By ▲ 1.48 (5.89%)
PIAA 25.40 Decreased By ▼ -1.11 (-4.19%)
PIBTL 6.55 Decreased By ▼ -0.10 (-1.5%)
PPL 121.95 Decreased By ▼ -3.45 (-2.75%)
PRL 27.73 Decreased By ▼ -0.48 (-1.7%)
PTC 13.80 Decreased By ▼ -0.50 (-3.5%)
SEARL 54.89 Increased By ▲ 0.29 (0.53%)
SNGP 69.70 Decreased By ▼ -1.50 (-2.11%)
SSGC 10.40 Decreased By ▼ -0.10 (-0.95%)
TELE 8.50 Decreased By ▼ -0.02 (-0.23%)
TPLP 10.95 Increased By ▲ 0.01 (0.09%)
TRG 60.90 Increased By ▲ 0.20 (0.33%)
UNITY 25.22 Decreased By ▼ -0.11 (-0.43%)
WTL 1.28 Increased By ▲ 0.02 (1.59%)
BR100 7,638 No Change 0 (0%)
BR30 24,972 No Change 0 (0%)
KSE100 73,079 Increased By 318 (0.44%)
KSE30 23,621 Decreased By -4 (-0.02%)
Pakistan

Rains multiply motorists’ agonies at ram-shackled Kahuta road

  • The road was already in dilapidated condition for more than five years due to negligence of the departments concerned, who turned a blind eye towards its mandatory post-construction maintenance.
Published December 8, 2020

ISLAMABAD: The ongoing rain-spell has multiplied the problems of motorists at Kahuta road especially around one-kilometer stretch from Kak Bridge to Slaughter House where dozens of potholes have turned into wide and deep ponds, making the movement difficult for all kinds of traffic.

The road was already in dilapidated condition for more than five years due to negligence of the departments concerned, who turned a blind eye towards its mandatory post-construction maintenance.

Last time, the Punjab government had reconstructed and widened the six-kilometer section of the single Kahuta road, from Kak Bridge to Swan camp, by allocating special funds just before the General Election-2013, but did not give due attention towards its periodic inspection and maintenance after coming into power again.

Since then, no repair work has been carried out despite repeated requests of the residents of Model Town Humak and adjoining localities, who feared that dilapidated condition of the road could lead to fatal accidents any time.

The Punjab Highway Department, Rawalpindi Development Authority, National Highway Authority and Capital Development Authority are holding each other responsible for the road maintenance after approval of the Rawalpindi-Kahuta road dualization project by the previous government, which is now uncertain due to paucity of funds.

Due to the road condition, all vehicles are driven in zigzags to avoid pool-like potholes especially near the Kak Bridge, Sihala Police Station, Model Town Humak and the underpass connecting the Grand Trunk (GT) Road.

The artery is of great strategic significance as its one end touches the GT Road and the other Islamabad Expressway, linking Azad Jammu and Kashmir with other parts of the country.

On one side of the busy road is the Kahuta Industrial Triangle Zone and on the other is residential area consisting of schools and colleges.

The frightening situation could be imagined when heavily loaded oil tankers and gigantic long vehicles ply on the single-road day and night for the transportation of factory goods in crisscross to avoid deep and wider potholes.

The residents have appealed to the authorities concerned to carry out the repair work without any further delay on an urgent basis to avoid any road tragedy.

Comments

Comments are closed.