AIRLINK 62.48 Increased By ▲ 2.05 (3.39%)
BOP 5.36 Increased By ▲ 0.01 (0.19%)
CNERGY 4.58 Decreased By ▼ -0.02 (-0.43%)
DFML 15.50 Increased By ▲ 0.66 (4.45%)
DGKC 66.40 Increased By ▲ 1.60 (2.47%)
FCCL 17.59 Increased By ▲ 0.73 (4.33%)
FFBL 27.70 Increased By ▲ 2.95 (11.92%)
FFL 9.27 Increased By ▲ 0.21 (2.32%)
GGL 10.06 Increased By ▲ 0.10 (1%)
HBL 105.70 Increased By ▲ 1.49 (1.43%)
HUBC 122.30 Increased By ▲ 4.78 (4.07%)
HUMNL 6.60 Increased By ▲ 0.06 (0.92%)
KEL 4.50 Decreased By ▼ -0.05 (-1.1%)
KOSM 4.48 Decreased By ▼ -0.09 (-1.97%)
MLCF 36.20 Increased By ▲ 0.79 (2.23%)
OGDC 122.92 Increased By ▲ 0.53 (0.43%)
PAEL 23.00 Increased By ▲ 1.09 (4.97%)
PIAA 29.34 Increased By ▲ 2.05 (7.51%)
PIBTL 5.80 Decreased By ▼ -0.14 (-2.36%)
PPL 107.50 Increased By ▲ 0.13 (0.12%)
PRL 27.25 Increased By ▲ 0.74 (2.79%)
PTC 18.07 Increased By ▲ 1.97 (12.24%)
SEARL 53.00 Decreased By ▼ -0.63 (-1.17%)
SNGP 63.21 Increased By ▲ 2.01 (3.28%)
SSGC 10.80 Increased By ▲ 0.05 (0.47%)
TELE 9.20 Increased By ▲ 0.71 (8.36%)
TPLP 11.44 Increased By ▲ 0.86 (8.13%)
TRG 70.86 Increased By ▲ 0.95 (1.36%)
UNITY 23.62 Increased By ▲ 0.11 (0.47%)
WTL 1.28 No Change ▼ 0.00 (0%)
BR100 6,941 Increased By 63.6 (0.92%)
BR30 22,802 Increased By 233 (1.03%)
KSE100 67,142 Increased By 594.3 (0.89%)
KSE30 22,090 Increased By 175.1 (0.8%)
Pakistan

PARCO's Coastal Oil Refinery to enable country achieve production of petroleum products at local level: PM

  • The prime minister expressed these views while presiding over a meeting about the establishment of Coastal Oil Refinery by PARCO.
Published December 7, 2020

ISLAMABAD: Prime Minister Imran Khan on Monday said that the completion of oil refinery project by Pak Arab Refinery Limited (PARCO) besides improving the capacity would also enable the country achieve its capability of producing oil products at local level.

He described the addition of PARCO Refinery as “good omen” for the country’s petroleum sector.

The prime minister expressed these views while presiding over a meeting about the establishment of Coastal Oil Refinery by PARCO.

Minister for Power Umar Ayub Khan, Special Assistant to PM Nadeem Babar and senior officials attended the meeting.

The meeting was told that work on the construction of terminal to be started within the next six months, the work on the establishment of refinery will be started after one year.

Comments

Comments are closed.