AIRLINK 74.10 Increased By ▲ 1.30 (1.79%)
BOP 5.00 Decreased By ▼ -0.06 (-1.19%)
CNERGY 4.42 Increased By ▲ 0.09 (2.08%)
DFML 30.07 Decreased By ▼ -0.45 (-1.47%)
DGKC 90.29 Increased By ▲ 4.34 (5.05%)
FCCL 23.06 Increased By ▲ 0.71 (3.18%)
FFBL 33.72 Increased By ▲ 0.50 (1.51%)
FFL 9.93 Increased By ▲ 0.15 (1.53%)
GGL 10.42 Increased By ▲ 0.02 (0.19%)
HBL 113.00 Decreased By ▼ -0.62 (-0.55%)
HUBC 137.80 Increased By ▲ 1.60 (1.17%)
HUMNL 9.75 Decreased By ▼ -0.28 (-2.79%)
KEL 4.75 Increased By ▲ 0.09 (1.93%)
KOSM 4.75 Increased By ▲ 0.35 (7.95%)
MLCF 39.70 Increased By ▲ 1.35 (3.52%)
OGDC 135.11 Increased By ▲ 1.71 (1.28%)
PAEL 28.82 Increased By ▲ 1.42 (5.18%)
PIAA 24.78 Increased By ▲ 0.02 (0.08%)
PIBTL 7.02 Increased By ▲ 0.47 (7.18%)
PPL 123.85 Increased By ▲ 2.64 (2.18%)
PRL 27.67 Increased By ▲ 0.52 (1.92%)
PTC 14.58 Increased By ▲ 0.69 (4.97%)
SEARL 61.85 Increased By ▲ 1.45 (2.4%)
SNGP 69.63 Increased By ▲ 1.10 (1.61%)
SSGC 10.42 Increased By ▲ 0.09 (0.87%)
TELE 8.94 Decreased By ▼ -0.11 (-1.22%)
TPLP 11.49 Increased By ▲ 0.23 (2.04%)
TRG 66.80 Increased By ▲ 1.10 (1.67%)
UNITY 25.28 Increased By ▲ 0.03 (0.12%)
WTL 1.58 Increased By ▲ 0.08 (5.33%)
BR100 7,712 Increased By 78.1 (1.02%)
BR30 25,601 Increased By 429.2 (1.71%)
KSE100 73,326 Increased By 667.9 (0.92%)
KSE30 23,539 Increased By 155.9 (0.67%)

KARACHI: President, SITE Association of Industry (SAI), Abdul Hadi has urged Prime Minister Imran Khan to enhance the load limit for SMEs from 70KW to 140KW so that more industries could avail the 50pc reduced tariff on excess electricity consumption.

Also the procedure for approval of excess load from the K-Electric needs to be simplified, he added.

“It is essential to enhance the limit to 140KW so that more and more SMEs could benefit from the announcement made by the Prime Minister of Pakistan which will not only give boost to the SMEs but also open up more avenues for employment besides stabilizing economy of the country”, Abdul Hadi remarked.

Due to removal of peak hours slab, industries will be able to get electricity on 24 hours basis at the same rate and continue industrial production without interruption.

He said that on using excess load by the industry, the same has to be approved by the K-Electric which is not an easy job. As such, the procedure for load enhancement must be simplified and other associated costs like installation of PMTs etc, should also be reduced.

Copyright Business Recorder, 2020

Comments

Comments are closed.