BR100 Increased By (1.82%)
BR30 Increased By (1.76%)
KSE100 Increased By (2.08%)
KSE30 Increased By (2.29%)
BECO 5.39 No Change ▼ 0.00 (0%)
BML 57.46 Increased By ▲ 0.98 (1.74%)
BOP 36.31 Increased By ▲ 1.22 (3.48%)
CNERGY 8.21 Increased By ▲ 0.04 (0.49%)
DCL 11.83 Increased By ▲ 0.39 (3.41%)
FCCL 59.28 Increased By ▲ 1.73 (3.01%)
FCSC 5.01 Increased By ▲ 0.01 (0.2%)
FFL 17.85 Decreased By ▼ -0.03 (-0.17%)
FNEL 1.26 Increased By ▲ 0.01 (0.8%)
HUMNL 11.50 Increased By ▲ 0.33 (2.95%)
KEL 8.33 Decreased By ▼ -0.21 (-2.46%)
KOSM 6.63 Decreased By ▼ -0.10 (-1.49%)
MLCF 107.43 Increased By ▲ 0.52 (0.49%)
NBP 205.01 Increased By ▲ 6.51 (3.28%)
PACE 11.10 Increased By ▲ 0.03 (0.27%)
PAEL 45.42 Decreased By ▼ -0.03 (-0.07%)
PIAHCLA 31.76 Increased By ▲ 0.33 (1.05%)
PIBTL 18.85 Decreased By ▼ -0.23 (-1.21%)
PPL 243.74 Increased By ▲ 1.12 (0.46%)
PRL 36.24 Increased By ▲ 0.57 (1.6%)
PTC 72.07 Increased By ▲ 6.55 (10%)
SEARL 94.58 Increased By ▲ 0.04 (0.04%)
SSGC 31.85 Decreased By ▼ -0.23 (-0.72%)
TELE 9.02 Increased By ▲ 0.15 (1.69%)
THCCL 68.47 Increased By ▲ 2.81 (4.28%)
TPLP 10.72 Decreased By ▼ -0.01 (-0.09%)
TREET 25.89 Increased By ▲ 0.78 (3.11%)
TRG 64.31 Increased By ▲ 0.64 (1.01%)
WAVES 10.91 Increased By ▲ 0.21 (1.96%)
WTL 1.29 Increased By ▲ 0.04 (3.2%)

ISLAMABAD: Nadeem Babar, Special Assistant to the Prime Minster (SAPM) on Petroleum chaired a stakeholders’ consultation meeting at the Ministry of Energy, Petroleum Division, on Wednesday, with the current and the interested LNG terminal operators.

The meeting was also attended by the secretary and the senior officers of the Petroleum Division.

The companies including Energas Terminals (Pvt) Ltd, Engro Elengy Terminal Ltd, ExxonMobile Pakistan (Pvt) Ltd, Mitsubishi Corporation, Pakistan Gas Port Consortium Limited, Tabeer Energy (Private) Limited, Pakistan State Oil Company Limited, Pakistan LNG Terminal Limited, Government Holdings (Pvt) Limited, and Interstate Gas Systems Ltd, attended the meeting. The meeting was held to consult the companies currently operating the LNG terminals in Pakistan, and also those with upcoming planned investments in this sector, so as to get better visibility of their projects in terms of design, capacity and schedule in order to align the gas transmission and distribution network being established by the Ministry of Energy, Petroleum Division in compliance with the decision of the Supreme Court of Pakistan to start work on North South Gas Pipeline within six months of 13th August 2020.

Copyright Business Recorder, 2020

Comments

Comments are closed for this article.