AIRLINK 74.85 Increased By ▲ 0.56 (0.75%)
BOP 4.98 Increased By ▲ 0.03 (0.61%)
CNERGY 4.49 Increased By ▲ 0.12 (2.75%)
DFML 40.00 Increased By ▲ 1.20 (3.09%)
DGKC 86.35 Increased By ▲ 1.53 (1.8%)
FCCL 21.36 Increased By ▲ 0.15 (0.71%)
FFBL 33.85 Decreased By ▼ -0.27 (-0.79%)
FFL 9.72 Increased By ▲ 0.02 (0.21%)
GGL 10.45 Increased By ▲ 0.03 (0.29%)
HBL 112.74 Decreased By ▼ -0.26 (-0.23%)
HUBC 137.44 Increased By ▲ 1.24 (0.91%)
HUMNL 11.42 Decreased By ▼ -0.48 (-4.03%)
KEL 5.28 Increased By ▲ 0.57 (12.1%)
KOSM 4.63 Increased By ▲ 0.19 (4.28%)
MLCF 37.80 Increased By ▲ 0.15 (0.4%)
OGDC 139.50 Increased By ▲ 3.30 (2.42%)
PAEL 25.61 Increased By ▲ 0.51 (2.03%)
PIAA 20.68 Increased By ▲ 1.44 (7.48%)
PIBTL 6.80 Increased By ▲ 0.09 (1.34%)
PPL 122.20 Increased By ▲ 0.10 (0.08%)
PRL 26.58 Decreased By ▼ -0.07 (-0.26%)
PTC 14.05 Increased By ▲ 0.12 (0.86%)
SEARL 58.98 Increased By ▲ 1.76 (3.08%)
SNGP 68.95 Increased By ▲ 1.35 (2%)
SSGC 10.30 Increased By ▲ 0.05 (0.49%)
TELE 8.38 Decreased By ▼ -0.02 (-0.24%)
TPLP 11.06 Decreased By ▼ -0.07 (-0.63%)
TRG 64.19 Increased By ▲ 1.38 (2.2%)
UNITY 26.55 Increased By ▲ 0.05 (0.19%)
WTL 1.45 Increased By ▲ 0.10 (7.41%)
BR100 7,841 Increased By 30.9 (0.4%)
BR30 25,465 Increased By 315.4 (1.25%)
KSE100 75,114 Increased By 157.8 (0.21%)
KSE30 24,114 Increased By 30.8 (0.13%)

imageISLAMABAD: The major portion of the China- Pakistan Economic Corridor (CPEC) transportation infrastructure projects' investment would go to Khyber Pakhtunkhwa, wherein as many as $3.825 billion would be spent on development of various infrastructure projects.

As many as $ 3.020 billion would be spent on the major portion of Karokaram Highway Phase-II (from Raikot to Islamabad), followed by an investment of $ 730 million on construction of a portion of expansion and reconstruction of existing main railway line ML-1, official sources said.

A sum of $ 35 million would be spent on major portion of Cross-border Optical Fiber Cable while $ 40 million would be spent on establishment of Havelian Dry Port.

The next major beneficiary of the CPEC infrastructure would be Punjab provinces, wherein $ 3.739 billion would be utilized for various projects.

A sum of $ 1.790 billion would be spent for construction of a portion of Sukkur-Multan of Peshawar-Karachi Motorway while $ 1.460 billion have been estimated cost of a portion of expansion and reconstruction of existing main railway line (ML-1).

Similarly, $ 480 million would be utilized for construction of small portion of Railkot-Islamabad Highway and $ 9 million for Cross Border Optical fiber Cable.

In Sindh, $ 2.260 million would be utilized for transport infrastructure projects, out of which $ 1.460 billion would be spent on expansion and reconstruction of a portion of existing Line ML-1.

An amount of $ 800 million would be spent on construction of a portion of Sukkur-Multan Section of Karachi Lahore Motorway (KLM).

About $ 793 million would be spent on 8 transport infrastructure projects of Balochistan province.

As many as $ 130 million would be spent on necessary facility of fresh water treatment and supply, $ 100 million for establishment of a hospital at Gwadar, $ 230 million for construction of Gawadar International Airport and $ 141 million for establishment of Eastbay Expressway.

Similarly, $ 123 million would be spent on construction of breakwaters, $ 27 million for dredging of berthing areas and channels, $ 32 million for infrastructure for Free Zone and EPZs-port related industries and $ 10 million for technical and vocational institute at Gwadar.

It is pertinent to mention here that CPEC is a long-term broad framework with multiple sectoral projects, which will be completed in different phases through bilateral agreements agreed upon by both sides as a win-win equation.

Pakistan and China had signed an agreement last year to commence work on CPEC development projects worth over $46 billion.

The corridor aims to connect Gwadar port in Balochistan to China's Xinjiang region via a network of highways, railways and pipelines spread over 3,000 KM. Work on several sections is in progress.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.