AIRLINK 74.40 Increased By ▲ 0.15 (0.2%)
BOP 5.03 Decreased By ▼ -0.02 (-0.4%)
CNERGY 4.43 Increased By ▲ 0.01 (0.23%)
DFML 37.70 Increased By ▲ 1.86 (5.19%)
DGKC 90.75 Increased By ▲ 2.75 (3.13%)
FCCL 22.67 Increased By ▲ 0.47 (2.12%)
FFBL 32.65 Decreased By ▼ -0.07 (-0.21%)
FFL 9.70 Decreased By ▼ -0.09 (-0.92%)
GGL 10.90 Increased By ▲ 0.10 (0.93%)
HBL 115.98 Increased By ▲ 0.08 (0.07%)
HUBC 136.30 Increased By ▲ 0.46 (0.34%)
HUMNL 10.04 Increased By ▲ 0.20 (2.03%)
KEL 4.61 No Change ▼ 0.00 (0%)
KOSM 4.89 Increased By ▲ 0.23 (4.94%)
MLCF 40.41 Increased By ▲ 0.53 (1.33%)
OGDC 137.50 Decreased By ▼ -0.40 (-0.29%)
PAEL 26.50 Increased By ▲ 0.07 (0.26%)
PIAA 25.35 Decreased By ▼ -0.93 (-3.54%)
PIBTL 6.72 Decreased By ▼ -0.04 (-0.59%)
PPL 122.78 Decreased By ▼ -0.12 (-0.1%)
PRL 26.75 Increased By ▲ 0.06 (0.22%)
PTC 14.06 Increased By ▲ 0.06 (0.43%)
SEARL 58.90 Increased By ▲ 0.20 (0.34%)
SNGP 70.01 Decreased By ▼ -0.39 (-0.55%)
SSGC 10.40 Increased By ▲ 0.04 (0.39%)
TELE 8.59 Increased By ▲ 0.03 (0.35%)
TPLP 11.20 Decreased By ▼ -0.18 (-1.58%)
TRG 64.75 Increased By ▲ 0.52 (0.81%)
UNITY 26.55 Increased By ▲ 0.50 (1.92%)
WTL 1.39 Increased By ▲ 0.01 (0.72%)
BR100 7,850 Increased By 12.3 (0.16%)
BR30 25,532 Increased By 72.2 (0.28%)
KSE100 75,149 Increased By 218.7 (0.29%)
KSE30 24,161 Increased By 15.3 (0.06%)

imageCAPE CANAVERAL: NASA's test run of a Mars landing system came to a quick end on Monday when the saucer-shaped vehicle's parachute tore away after partly unfurling high over the Pacific Ocean, a NASA TV broadcast showed.

A similar problem bedeviled the Low Density Supersonic Decelerator's (LDSD) debut run last year. The parachute was redesigned and reinforced for the second flight, but more work will be needed before the system is ready to land heavy loads on Mars.

"This is exactly why we do tests like this," NASA engineer and LDSD mission commentator Dan Coatta said after the test. "When we're actually ready to send spacecraft to Mars, we know that they are going to work when that big mission is on the line."

The 100-foot diameter parachute - the largest ever tested - was the second part of a two-part supersonic braking system NASA has been developing for about five years, at a cost of about $230 million.

Like last year, LDSD's doughnut-shaped extension ring inflated as expected, adding surface area to increase the amount of friction and slow the vehicle's descent through the atmosphere.

Copyright Reuters, 2015

Comments

Comments are closed.