BR100 Decreased By (-0.98%)
BR30 Decreased By (-0.58%)
KSE100 Decreased By (-0.97%)
KSE30 Decreased By (-1.07%)
AGHA 7.70 Decreased By ▼ -0.11 (-1.41%)
BECO 5.13 Decreased By ▼ -0.08 (-1.54%)
BML 56.67 Decreased By ▼ -0.83 (-1.44%)
BOP 33.75 Decreased By ▼ -0.28 (-0.82%)
CNERGY 9.88 Decreased By ▼ -0.08 (-0.8%)
CSIL 5.29 Decreased By ▼ -0.02 (-0.38%)
FCCL 53.09 Decreased By ▼ -1.61 (-2.94%)
FFL 16.52 Decreased By ▼ -0.17 (-1.02%)
FNEL 1.21 Decreased By ▼ -0.02 (-1.63%)
KEL 7.22 Decreased By ▼ -0.18 (-2.43%)
KOSM 5.72 Decreased By ▼ -0.05 (-0.87%)
LOTCHEM 29.31 Decreased By ▼ -0.01 (-0.03%)
MLCF 92.16 Decreased By ▼ -2.20 (-2.33%)
NBP 201.61 Decreased By ▼ -1.44 (-0.71%)
NCPL 56.45 Decreased By ▼ -0.55 (-0.96%)
NPL 66.57 Decreased By ▼ -1.13 (-1.67%)
OGDC 316.29 Increased By ▲ 0.45 (0.14%)
PACE 10.48 Decreased By ▼ -0.16 (-1.5%)
PAEL 42.04 Decreased By ▼ -1.16 (-2.69%)
PIBTL 16.41 Decreased By ▼ -0.33 (-1.97%)
PPL 216.84 Decreased By ▼ -2.94 (-1.34%)
PRL 50.86 Increased By ▲ 1.67 (3.39%)
PTC 69.86 Decreased By ▼ -0.67 (-0.95%)
SSGC 26.98 Decreased By ▼ -1.27 (-4.5%)
TBL 9.73 Decreased By ▼ -0.13 (-1.32%)
TELE 8.65 Decreased By ▼ -0.14 (-1.59%)
TPL 17.90 Decreased By ▼ -0.34 (-1.86%)
TPLP 13.39 Increased By ▲ 0.12 (0.9%)
TREET 22.56 Decreased By ▼ -0.16 (-0.7%)
TRG 59.26 Decreased By ▼ -0.88 (-1.46%)
Markets

China, Central Asian countries open 3rd gas line

Published Updated

imageISLAMABAD: The third line of the China-Central Asia Natural Gas Pipeline started to transport natural gas to China, China National Petroleum Corporation (CNPC) announced late Sunday.

The 1,830-km Line C of the pipeline, parallel to Line A and Line B, starts at the Turkmen-Uzbek border and runs through central Uzbekistan and southern Kazakhstan before reaching China's northwest region of Xinjiang, Xinhua News reported.

The transport capacity of Line C, which currently stands at 7 billion cubic meters per year, is expected to hit 25 billion cubic meters by the end of 2015, comprising 10 billion cubic meters from Turkmenistan, 10 billion cubic meters from Uzbekistan and 5 billion cubic meters from Kazakhstan.

By then, the three lines, built by CNPC and its central Asian partners, would have a combined capacity of 55 billion cubic meters per year.

Line A was launched in December 2009, and Line B in October 2010. The building of Line D of the pipeline is expected to be launched at the end of this year.

Comments

Comments are closed for this article.