AIRLINK 74.64 Decreased By ▼ -0.21 (-0.28%)
BOP 5.01 Increased By ▲ 0.03 (0.6%)
CNERGY 4.51 Increased By ▲ 0.02 (0.45%)
DFML 42.44 Increased By ▲ 2.44 (6.1%)
DGKC 87.02 Increased By ▲ 0.67 (0.78%)
FCCL 21.58 Increased By ▲ 0.22 (1.03%)
FFBL 33.54 Decreased By ▼ -0.31 (-0.92%)
FFL 9.66 Decreased By ▼ -0.06 (-0.62%)
GGL 10.43 Decreased By ▼ -0.02 (-0.19%)
HBL 114.29 Increased By ▲ 1.55 (1.37%)
HUBC 139.94 Increased By ▲ 2.50 (1.82%)
HUMNL 12.25 Increased By ▲ 0.83 (7.27%)
KEL 5.21 Decreased By ▼ -0.07 (-1.33%)
KOSM 4.50 Decreased By ▼ -0.13 (-2.81%)
MLCF 38.09 Increased By ▲ 0.29 (0.77%)
OGDC 139.16 Decreased By ▼ -0.34 (-0.24%)
PAEL 25.87 Increased By ▲ 0.26 (1.02%)
PIAA 22.20 Increased By ▲ 1.52 (7.35%)
PIBTL 6.80 No Change ▼ 0.00 (0%)
PPL 123.58 Increased By ▲ 1.38 (1.13%)
PRL 26.81 Increased By ▲ 0.23 (0.87%)
PTC 14.01 Decreased By ▼ -0.04 (-0.28%)
SEARL 58.53 Decreased By ▼ -0.45 (-0.76%)
SNGP 68.01 Decreased By ▼ -0.94 (-1.36%)
SSGC 10.47 Increased By ▲ 0.17 (1.65%)
TELE 8.39 Increased By ▲ 0.01 (0.12%)
TPLP 11.05 Decreased By ▼ -0.01 (-0.09%)
TRG 63.21 Decreased By ▼ -0.98 (-1.53%)
UNITY 26.59 Increased By ▲ 0.04 (0.15%)
WTL 1.42 Decreased By ▼ -0.03 (-2.07%)
BR100 7,943 Increased By 105.5 (1.35%)
BR30 25,639 Increased By 187.1 (0.73%)
KSE100 75,983 Increased By 868.6 (1.16%)
KSE30 24,445 Increased By 330.8 (1.37%)

imageBUENOS AIRES: The construction of two hydroelectric dams in Argentina's Patagonia region has been awarded to a consortium of domestic and Chinese companies, President Cristina Kirchner announced Wednesday.

Local Electroingenieria e Hidrocuyo and China-based Gezhouba Group Company Limited secured the deal, Kirchner said.

Those losing out include Alstom (France)- Odebrecht (Brazil), Isolux (Spain), Sinohydro (China) and Hyundai (South Korea).

The dams, to be built on the Santa Cruz river, will have a production capacity of 1.740 megawatts, or 4.7 percent of national electric production.

Kirchner said the new construction would mean that the Santa Cruz river would have the second largest dam after Yacyreta, a dam located on the Parana river and jointly administered by Argentina and Paraguay.

Argentina relies heavily on the Yacyreta dam, which covers 22 percent of the country's electricity needs.

The Santa Cruz river, which extends some 385 kilometers (240 miles), originates in the Andes and flows into the Atlantic Ocean.

Argentine officials say construction, which will begin in December, will take five years and create 5,000 jobs.

The two new dams will be named after former governors of Santa Cruz state -- Jorge Cepernic and Nestor Kirchner, who was president from 2003 and 2007.

Copyright AFP (Agence France-Presse), 2013

Comments

Comments are closed.