BR100 Decreased By (-0.02%)
BR30 Increased By (0.15%)
KSE100 Increased By (0.02%)
KSE30 Decreased By (-0.01%)
AGHA 7.36 Decreased By ▼ -0.20 (-2.65%)
BECO 5.10 Increased By ▲ 0.01 (0.2%)
BML 56.10 Increased By ▲ 1.12 (2.04%)
BOP 32.83 Decreased By ▼ -0.15 (-0.45%)
CNERGY 10.35 Increased By ▲ 0.25 (2.48%)
CSIL 5.07 Decreased By ▼ -0.06 (-1.17%)
FCCL 52.08 Increased By ▲ 0.83 (1.62%)
FFL 16.34 Increased By ▲ 0.16 (0.99%)
FNEL 1.21 Increased By ▲ 0.02 (1.68%)
KEL 7.18 Increased By ▲ 0.12 (1.7%)
KOSM 5.90 Increased By ▲ 0.36 (6.5%)
LOTCHEM 26.93 Decreased By ▼ -2.19 (-7.52%)
MLCF 89.50 Increased By ▲ 0.68 (0.77%)
NBP 194.99 Decreased By ▼ -2.50 (-1.27%)
NCPL 55.61 Increased By ▲ 0.59 (1.07%)
NPL 64.83 Decreased By ▼ -0.05 (-0.08%)
OGDC 312.40 Increased By ▲ 0.45 (0.14%)
PACE 10.28 Increased By ▲ 0.07 (0.69%)
PAEL 40.70 Decreased By ▼ -0.29 (-0.71%)
PIBTL 15.95 Decreased By ▼ -0.01 (-0.06%)
PPL 212.70 Increased By ▲ 0.04 (0.02%)
PRL 53.51 Increased By ▲ 0.97 (1.85%)
PTC 69.00 Decreased By ▼ -0.08 (-0.12%)
SSGC 24.85 Decreased By ▼ -0.25 (-1%)
TBL 9.52 Decreased By ▼ -0.10 (-1.04%)
TELE 8.35 Increased By ▲ 0.03 (0.36%)
TPL 18.15 Increased By ▲ 0.40 (2.25%)
TPLP 12.98 Decreased By ▼ -0.24 (-1.82%)
TREET 21.42 Decreased By ▼ -0.32 (-1.47%)
TRG 59.33 Increased By ▲ 2.44 (4.29%)

LAHORE: Work on the first phase under the China-Pakistan Economic Corridor (CPEC) project for upgradation of Pakistan Railways will start in April with the investment of US$3.2 billion.

PR sources told APP on Sunday that track of four sections would be upgraded under the first phase of CPEC for railways.

The PR sections including Lahore-Rawalpindi, Lahore-Multan, Kaluwal-Pindora and Rohari-Nawab Shah will be upraded in this phase.

The upgradation of the track between Lahore and Rawalpindi will cut the duration of journey between the two destinations by two hours, while sharp curves at Kaluwal-Pindora track would be straightened for reduction of duration, sources added.

The sources said that dual tracks would be laid on these sections while the signalling system on these tracks will also be improved, adding that replacement of the outdated signalling system was already in progress from Lahore to Lalamusa and the system from Lalamusa to Peshawar would be improved in the first phase of the CPEC.

The upgradation of rail tracks would also be helpful in improving freight services, the PR sources said.

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed for this article.