BR100 Increased By (0.74%)
BR30 Increased By (0.62%)
KSE100 Increased By (0.72%)
KSE30 Increased By (0.76%)
AGHA 7.77 Increased By ▲ 0.02 (0.26%)
BECO 5.20 Increased By ▲ 0.01 (0.19%)
BML 57.93 Decreased By ▼ -0.73 (-1.24%)
BOP 34.32 Increased By ▲ 0.63 (1.87%)
CNERGY 11.00 Increased By ▲ 0.39 (3.68%)
CSIL 5.48 Increased By ▲ 0.18 (3.4%)
FCCL 54.50 Increased By ▲ 0.76 (1.41%)
FFL 16.66 Increased By ▲ 0.20 (1.22%)
FNEL 1.24 Increased By ▲ 0.02 (1.64%)
KEL 7.40 Increased By ▲ 0.12 (1.65%)
KOSM 5.77 Increased By ▲ 0.13 (2.3%)
LOTCHEM 29.78 Increased By ▲ 0.13 (0.44%)
MLCF 95.78 Decreased By ▼ -0.58 (-0.6%)
NBP 204.99 Increased By ▲ 1.46 (0.72%)
NCPL 57.83 Increased By ▲ 0.98 (1.72%)
NPL 69.31 Increased By ▲ 2.00 (2.97%)
OGDC 318.05 Decreased By ▼ -0.17 (-0.05%)
PACE 10.85 Increased By ▲ 0.22 (2.07%)
PAEL 43.05 Increased By ▲ 1.28 (3.06%)
PIBTL 16.98 Increased By ▲ 0.17 (1.01%)
PPL 221.70 Increased By ▲ 1.53 (0.69%)
PRL 52.25 Increased By ▲ 3.20 (6.52%)
PTC 71.30 Increased By ▲ 1.29 (1.84%)
SSGC 29.39 Increased By ▲ 0.25 (0.86%)
TBL 9.88 Increased By ▲ 0.11 (1.13%)
TELE 8.93 Increased By ▲ 0.11 (1.25%)
TPL 17.73 Increased By ▲ 0.56 (3.26%)
TPLP 12.91 Increased By ▲ 0.40 (3.2%)
TREET 22.85 Increased By ▲ 0.26 (1.15%)
TRG 60.00 Decreased By ▼ -0.22 (-0.37%)
Business & Finance

KE to conduct annual maintenance on 14 out of 74 grids in December

  • KE says the maintenance is a routine preventive measure to ensure reliable and efficient high-voltage power supply across major city areas
Published Updated

K-Electric (KE) will carry out annual maintenance work on 14 of its 74 grid stations during December as part of its scheduled winter transmission network upkeep, the power utility said on Monday.

According to a statement, the activities are part of routine preventive measures aimed at ensuring the reliability and efficiency of high-voltage equipment supplying electricity to major parts of the city.

KE spokesperson Imran Rana said the utility conducts these shutdowns every winter to maintain system health and uninterrupted supply in the long run.

“Out of 74, about 14 grid stations will be undergoing maintenance activities in December. KE will make all possible efforts to provide electricity through alternative means during this period,” he added.

City-wide operations: KE removes over 550 illegal connections

The planned maintenance will be carried out at Clifton, Airport-I and Airport-II, Valika, North Karachi, Surjani, Hospital, Azizabad, Federal A and Federal B, PRL, Gharo, Elander Road and Liaquatabad grids, along with associated high-voltage transmission lines.

The company cautioned that some areas linked with these grids may experience temporary power interruptions.

It stressed that maintenance-related outages should not be confused with loadshedding.

Consumers can check their respective schedules on the KE website and KE Live App, or social media channel.

Comments

Comments are closed for this article.

SHEHZAD AZIZ Dec 10, 2025 01:07am
Illegal kunda connection in front of Bismillah Marriage Lawn (3/137A shah faisal colony)where underground wire goes to main road. The illegal kunda connection use by fruit retailers.
0