BR100 Increased By (0.2%)
BR30 Increased By (0.41%)
KSE100 Increased By (0.07%)
KSE30 Increased By (0.23%)
AGHA 7.75 Decreased By ▼ -0.17 (-2.15%)
BECO 5.19 Decreased By ▼ -0.01 (-0.19%)
BML 58.66 Decreased By ▼ -0.59 (-1%)
BOP 33.69 Increased By ▲ 0.01 (0.03%)
CNERGY 10.61 Increased By ▲ 0.80 (8.15%)
CSIL 5.30 Decreased By ▼ -0.12 (-2.21%)
FCCL 53.74 Increased By ▲ 0.22 (0.41%)
FFL 16.46 Decreased By ▼ -0.22 (-1.32%)
FNEL 1.22 Increased By ▲ 0.01 (0.83%)
KEL 7.28 Decreased By ▼ -0.07 (-0.95%)
KOSM 5.64 Increased By ▲ 0.03 (0.53%)
LOTCHEM 29.65 Increased By ▲ 0.54 (1.86%)
MLCF 96.36 Increased By ▲ 0.86 (0.9%)
NBP 203.53 Decreased By ▼ -0.82 (-0.4%)
NCPL 56.85 Decreased By ▼ -1.39 (-2.39%)
NPL 67.31 Decreased By ▼ -0.48 (-0.71%)
OGDC 318.22 Increased By ▲ 0.28 (0.09%)
PACE 10.63 Decreased By ▼ -0.08 (-0.75%)
PAEL 41.77 Decreased By ▼ -0.06 (-0.14%)
PIBTL 16.81 Increased By ▲ 0.31 (1.88%)
PPL 220.17 Increased By ▲ 0.43 (0.2%)
PRL 49.05 Increased By ▲ 4.46 (10%)
PTC 70.01 Decreased By ▼ -0.76 (-1.07%)
SSGC 29.14 Increased By ▲ 0.21 (0.73%)
TBL 9.77 Decreased By ▼ -0.07 (-0.71%)
TELE 8.82 Increased By ▲ 0.06 (0.68%)
TPL 17.17 Increased By ▲ 0.72 (4.38%)
TPLP 12.51 Increased By ▲ 0.41 (3.39%)
TREET 22.59 Decreased By ▼ -0.21 (-0.92%)
TRG 60.22 Increased By ▲ 0.19 (0.32%)
By

A joint venture between India’s JSW Steel and Japan’s JFE Steel will invest 58.45 billion rupees ($669 million) to expand production capacity of cold rolled grain-oriented electrical steel across two Indian plants to meet growing domestic demand, JSW Steel said on Monday.

JSW and JFE will equally fund a combined 19.66 billion rupees for the expansion through equity, JSW Steel said. The added capacity will be commissioned in phases from fiscal year 2028. The company did the specify the source of rest of the funds.

Cold rolled grain-oriented electrical steel is mainly used in energy applications, and is considered to be more energy efficient, reducing carbon emissions.

JSW JFE Electrical Steel will raise production of the steel at its Nashik plant to 250,000 tons per annum from the current 50,000 TPA, for which the two companies plan to invest 43 billion rupees.

India’s top court to revisit order scrapping JSW Steel’s $2.3 billion Bhushan Power deal

The companies will invest the remaining 15.45 billion rupees to augment capacity of an upcoming facility in Vijayanagar to 100,000 TPA from an originally planned 62,000 TPA, JSW Steel said in an exchange filing.

JSW JFE’s Nashik plant was bought in January from Germany’s Thyssenkrupp in a 41.59 billion rupee deal.

Comments

Comments are closed for this article.