BR100 Increased By (0.01%)
BR30 Increased By (0.53%)
KSE100 Increased By (0.28%)
KSE30 Increased By (0.29%)
AGHA 6.38 Increased By ▲ 0.06 (0.95%)
BECO 4.35 Increased By ▲ 0.08 (1.87%)
BML 62.55 Increased By ▲ 0.10 (0.16%)
BOP 31.39 Increased By ▲ 0.16 (0.51%)
CNERGY 11.73 Increased By ▲ 0.14 (1.21%)
CSIL 5.91 Increased By ▲ 0.19 (3.32%)
FCCL 61.71 Increased By ▲ 0.17 (0.28%)
FFL 14.79 Decreased By ▼ -0.23 (-1.53%)
FNEL 1.24 Increased By ▲ 0.01 (0.81%)
KEL 6.32 Increased By ▲ 0.06 (0.96%)
KOSM 5.90 Increased By ▲ 0.34 (6.12%)
LOTCHEM 24.69 Increased By ▲ 0.01 (0.04%)
MLCF 103.93 Decreased By ▼ -0.15 (-0.14%)
NBP 173.32 Decreased By ▼ -1.96 (-1.12%)
NCPL 51.83 Decreased By ▼ -0.94 (-1.78%)
NPL 54.03 Decreased By ▼ -0.09 (-0.17%)
OGDC 315.87 Increased By ▲ 2.48 (0.79%)
PACE 9.26 Increased By ▲ 0.06 (0.65%)
PAEL 35.58 Decreased By ▼ -0.22 (-0.61%)
PIBTL 13.66 Increased By ▲ 0.19 (1.41%)
PPL 226.07 Increased By ▲ 4.26 (1.92%)
PRL 80.28 Increased By ▲ 1.20 (1.52%)
PTC 46.64 Decreased By ▼ -0.21 (-0.45%)
SSGC 23.82 Decreased By ▼ -0.05 (-0.21%)
TBL 9.24 Decreased By ▼ -0.07 (-0.75%)
TELE 7.55 Increased By ▲ 0.16 (2.17%)
TPL 24.54 Decreased By ▼ -0.57 (-2.27%)
TPLP 12.99 Increased By ▲ 0.48 (3.84%)
TREET 25.98 Decreased By ▼ -0.27 (-1.03%)
TRG 53.33 Decreased By ▼ -0.11 (-0.21%)
By

A joint venture between India’s JSW Steel and Japan’s JFE Steel will invest 58.45 billion rupees ($669 million) to expand production capacity of cold rolled grain-oriented electrical steel across two Indian plants to meet growing domestic demand, JSW Steel said on Monday.

JSW and JFE will equally fund a combined 19.66 billion rupees for the expansion through equity, JSW Steel said. The added capacity will be commissioned in phases from fiscal year 2028. The company did the specify the source of rest of the funds.

Cold rolled grain-oriented electrical steel is mainly used in energy applications, and is considered to be more energy efficient, reducing carbon emissions.

JSW JFE Electrical Steel will raise production of the steel at its Nashik plant to 250,000 tons per annum from the current 50,000 TPA, for which the two companies plan to invest 43 billion rupees.

India’s top court to revisit order scrapping JSW Steel’s $2.3 billion Bhushan Power deal

The companies will invest the remaining 15.45 billion rupees to augment capacity of an upcoming facility in Vijayanagar to 100,000 TPA from an originally planned 62,000 TPA, JSW Steel said in an exchange filing.

JSW JFE’s Nashik plant was bought in January from Germany’s Thyssenkrupp in a 41.59 billion rupee deal.

Comments

Comments are closed for this article.