BR100 Decreased By (-0.15%)
BR30 Decreased By (-0.74%)
KSE100 Decreased By (-0.41%)
KSE30 Decreased By (-0.67%)
BECO 5.80 Decreased By ▼ -0.23 (-3.81%)
BML 58.03 Increased By ▲ 5.28 (10.01%)
BOP 33.85 Decreased By ▼ -0.40 (-1.17%)
CNERGY 8.15 Decreased By ▼ -0.01 (-0.12%)
DCL 11.77 Decreased By ▼ -0.57 (-4.62%)
FCCL 53.35 Decreased By ▼ -0.54 (-1%)
FCSC 5.40 Increased By ▲ 0.18 (3.45%)
FFL 17.89 Decreased By ▼ -0.14 (-0.78%)
FNEL 1.31 Increased By ▲ 0.01 (0.77%)
HUMNL 11.06 Increased By ▲ 0.06 (0.55%)
KEL 8.05 Decreased By ▼ -0.06 (-0.74%)
KOSM 5.45 Increased By ▲ 0.07 (1.3%)
MLCF 87.19 Decreased By ▼ -0.86 (-0.98%)
NBP 184.60 Decreased By ▼ -1.88 (-1.01%)
PACE 11.62 Increased By ▲ 0.90 (8.4%)
PAEL 40.31 Increased By ▲ 0.37 (0.93%)
PIAHCLA 26.10 Decreased By ▼ -0.07 (-0.27%)
PIBTL 17.09 Decreased By ▼ -0.23 (-1.33%)
PPL 228.40 Decreased By ▼ -4.38 (-1.88%)
PRL 34.59 Decreased By ▼ -0.36 (-1.03%)
PTC 67.35 Decreased By ▼ -0.21 (-0.31%)
SEARL 91.00 Increased By ▲ 0.07 (0.08%)
SSGC 26.90 Decreased By ▼ -0.27 (-0.99%)
TELE 8.53 Decreased By ▼ -0.04 (-0.47%)
THCCL 66.14 Increased By ▲ 6.01 (10%)
TPLP 9.29 Increased By ▲ 0.53 (6.05%)
TREET 24.59 Increased By ▲ 0.05 (0.2%)
TRG 71.69 Decreased By ▼ -0.06 (-0.08%)
WAVES 10.98 Increased By ▲ 1.00 (10.02%)
WTL 1.28 Increased By ▲ 0.02 (1.59%)
By

A joint venture between India’s JSW Steel and Japan’s JFE Steel will invest 58.45 billion rupees ($669 million) to expand production capacity of cold rolled grain-oriented electrical steel across two Indian plants to meet growing domestic demand, JSW Steel said on Monday.

JSW and JFE will equally fund a combined 19.66 billion rupees for the expansion through equity, JSW Steel said. The added capacity will be commissioned in phases from fiscal year 2028. The company did the specify the source of rest of the funds.

Cold rolled grain-oriented electrical steel is mainly used in energy applications, and is considered to be more energy efficient, reducing carbon emissions.

JSW JFE Electrical Steel will raise production of the steel at its Nashik plant to 250,000 tons per annum from the current 50,000 TPA, for which the two companies plan to invest 43 billion rupees.

India’s top court to revisit order scrapping JSW Steel’s $2.3 billion Bhushan Power deal

The companies will invest the remaining 15.45 billion rupees to augment capacity of an upcoming facility in Vijayanagar to 100,000 TPA from an originally planned 62,000 TPA, JSW Steel said in an exchange filing.

JSW JFE’s Nashik plant was bought in January from Germany’s Thyssenkrupp in a 41.59 billion rupee deal.

Comments

Comments are closed for this article.