BR100 Increased By (0.49%)
BR30 Increased By (0.58%)
KSE100 Increased By (0.5%)
KSE30 Increased By (0.5%)
AGHA 7.70 Increased By ▲ 0.11 (1.45%)
BECO 5.61 Increased By ▲ 0.10 (1.81%)
BML 60.13 Increased By ▲ 1.05 (1.78%)
BOP 34.65 Increased By ▲ 0.54 (1.58%)
CNERGY 13.02 Increased By ▲ 0.18 (1.4%)
CSIL 6.07 Decreased By ▼ -0.03 (-0.49%)
FCCL 57.70 Increased By ▲ 0.04 (0.07%)
FFL 16.30 Increased By ▲ 0.10 (0.62%)
FNEL 1.21 No Change ▼ 0.00 (0%)
KEL 7.46 Decreased By ▼ -0.02 (-0.27%)
KOSM 6.19 Increased By ▲ 0.25 (4.21%)
LOTCHEM 27.85 Decreased By ▼ -0.14 (-0.5%)
MLCF 101.16 Increased By ▲ 0.51 (0.51%)
NBP 207.01 Increased By ▲ 3.26 (1.6%)
NCPL 60.22 Decreased By ▼ -0.35 (-0.58%)
NPL 69.30 Decreased By ▼ -0.66 (-0.94%)
OGDC 320.78 Increased By ▲ 0.49 (0.15%)
PACE 11.30 Increased By ▲ 0.20 (1.8%)
PAEL 43.10 Decreased By ▼ -0.02 (-0.05%)
PIBTL 16.72 Increased By ▲ 0.16 (0.97%)
PPL 229.21 Increased By ▲ 0.37 (0.16%)
PRL 71.45 Increased By ▲ 0.43 (0.61%)
PTC 71.95 Increased By ▲ 0.30 (0.42%)
SSGC 26.42 Decreased By ▼ -0.26 (-0.97%)
TBL 10.43 Increased By ▲ 0.62 (6.32%)
TELE 8.63 Increased By ▲ 0.02 (0.23%)
TPL 22.58 Increased By ▲ 0.34 (1.53%)
TPLP 15.35 Increased By ▲ 0.24 (1.59%)
TREET 25.15 Increased By ▲ 1.02 (4.23%)
TRG 59.98 Increased By ▲ 0.14 (0.23%)

KARACHI: CEO of Karachi Water and Sewerage Corporation (KW&SC) Ahmed Ali Siddiqui, visited the University of Karachi and inspected the damaged water supply line.

On this occasion, Chief Engineer WTM, Zafar Palijo, gave the CEO KW&SC a detailed briefing regarding the ongoing repair work.

According to the Spokesperson of the KW&SC, the CEO KW&SC reviewed the speed, quality, and necessary facilities related to the repair work and instructed the concerned officers to ensure that the work is completed within the stipulated time so that the water supply from the University of Karachi line can be restored.

He clearly stated that no delay in the repair work will be tolerated and that the process will be closely monitored to ensure that water supply is restored to citizens as soon as possible.

On the occasion, the Chief Engineer WTM assured the CEO KW&SC that the repair work will be completed on time and the restoration of water supply will be ensured.

Copyright Business Recorder, 2025

Comments

Comments are closed for this article.