BR100 Increased By (0.11%)
BR30 Decreased By (-0.26%)
KSE100 Increased By (0.12%)
KSE30 Increased By (0.09%)
AGHA 7.79 Increased By ▲ 0.04 (0.52%)
BECO 5.23 Increased By ▲ 0.04 (0.77%)
BML 57.26 Decreased By ▼ -1.40 (-2.39%)
BOP 34.10 Increased By ▲ 0.41 (1.22%)
CNERGY 9.92 Decreased By ▼ -0.69 (-6.5%)
CSIL 5.35 Increased By ▲ 0.05 (0.94%)
FCCL 54.61 Increased By ▲ 0.87 (1.62%)
FFL 16.70 Increased By ▲ 0.24 (1.46%)
FNEL 1.24 Increased By ▲ 0.02 (1.64%)
KEL 7.42 Increased By ▲ 0.14 (1.92%)
KOSM 5.75 Increased By ▲ 0.11 (1.95%)
LOTCHEM 29.35 Decreased By ▼ -0.30 (-1.01%)
MLCF 94.35 Decreased By ▼ -2.01 (-2.09%)
NBP 202.70 Decreased By ▼ -0.83 (-0.41%)
NCPL 57.00 Increased By ▲ 0.15 (0.26%)
NPL 67.78 Increased By ▲ 0.47 (0.7%)
OGDC 316.40 Decreased By ▼ -1.82 (-0.57%)
PACE 10.64 Increased By ▲ 0.01 (0.09%)
PAEL 43.15 Increased By ▲ 1.38 (3.3%)
PIBTL 16.72 Decreased By ▼ -0.09 (-0.54%)
PPL 220.50 Increased By ▲ 0.33 (0.15%)
PRL 49.05 No Change ▼ 0.00 (0%)
PTC 70.98 Increased By ▲ 0.97 (1.39%)
SSGC 28.17 Decreased By ▼ -0.97 (-3.33%)
TBL 9.90 Increased By ▲ 0.13 (1.33%)
TELE 8.80 Decreased By ▼ -0.02 (-0.23%)
TPL 18.14 Increased By ▲ 0.97 (5.65%)
TPLP 13.40 Increased By ▲ 0.89 (7.11%)
TREET 22.75 Increased By ▲ 0.16 (0.71%)
TRG 60.30 Increased By ▲ 0.08 (0.13%)

ISLAMABAD: The installation process of Advanced Metering Infrastructure (AMI) meters equipped with modern technology and modern requirements is going on rapidly in two operation circles of IESCO Rawalpindi City and Rawalpindi Cantt.

Project Director AMI Mohsin Raza Gilani while giving details said that in the initial phase, advanced metering infrastructure (AMI) meters are being installed in the Rawalpindi City and Rawalpindi cantt circles and so far 275000 AMI meters have been replaced with old electricity meters and hopefully by the end of the year 2026, 1.2 million old meters of Rawalpindi City and Rawalpindi cant circles will be replaced with AMI meters.

Mohsin Raza Gilani said that in the arrears of Korang, Swan, DHA 2, Chaklala, Chandi Chowk, F Block, Saham, Khayaban Sir Syed, Gangal, Fiaiza, Murree Road, PWD, National Police Foundation, Media Town areas AMI meters have been installed and it is hoped that the target of installation of 1.2 million AMI meters will be achieved within the stipulated period. He said the advance metering Infrastructure AMI meters will ensure Automatic meter reading, control of electricity theft, elimination of system overloading, reduction in burn incidents of transformers and meters and will also ensure timely registration and rectification of valuable IESCO customers’ complaints.

Copyright Business Recorder, 2024

Comments

Comments are closed for this article.