BR100 Increased By (0.78%)
BR30 Increased By (1.02%)
KSE100 Increased By (0.52%)
KSE30 Increased By (0.53%)
BECO 6.16 Increased By ▲ 0.39 (6.76%)
BML 52.84 Decreased By ▼ -0.16 (-0.3%)
BOP 34.39 Increased By ▲ 0.40 (1.18%)
CNERGY 8.18 Increased By ▲ 0.07 (0.86%)
DCL 12.20 No Change ▼ 0.00 (0%)
FCCL 53.46 Increased By ▲ 0.63 (1.19%)
FCSC 5.18 Increased By ▲ 0.11 (2.17%)
FFL 18.06 Increased By ▲ 0.11 (0.61%)
FNEL 1.31 Increased By ▲ 0.02 (1.55%)
HUMNL 10.86 Decreased By ▼ -0.02 (-0.18%)
KEL 8.10 Increased By ▲ 0.08 (1%)
KOSM 5.35 Decreased By ▼ -0.17 (-3.08%)
MLCF 87.40 Increased By ▲ 0.89 (1.03%)
NBP 187.24 Increased By ▲ 2.08 (1.12%)
PACE 10.68 Increased By ▲ 0.10 (0.95%)
PAEL 39.94 Increased By ▲ 0.52 (1.32%)
PIAHCLA 26.11 Decreased By ▼ -0.11 (-0.42%)
PIBTL 16.98 Increased By ▲ 0.31 (1.86%)
PPL 230.15 Increased By ▲ 1.97 (0.86%)
PRL 34.86 Increased By ▲ 0.18 (0.52%)
PTC 67.06 Increased By ▲ 1.73 (2.65%)
SEARL 90.80 Increased By ▲ 0.67 (0.74%)
SSGC 26.82 Increased By ▲ 0.22 (0.83%)
TELE 8.64 Increased By ▲ 0.36 (4.35%)
THCCL 58.70 Increased By ▲ 0.20 (0.34%)
TPLP 8.65 Increased By ▲ 0.43 (5.23%)
TREET 24.80 Increased By ▲ 0.27 (1.1%)
TRG 69.85 Increased By ▲ 0.14 (0.2%)
WAVES 10.03 Increased By ▲ 0.09 (0.91%)
WTL 1.29 Increased By ▲ 0.01 (0.78%)

ISLAMABAD: The installation process of Advanced Metering Infrastructure (AMI) meters equipped with modern technology and modern requirements is going on rapidly in two operation circles of IESCO Rawalpindi City and Rawalpindi Cantt.

Project Director AMI Mohsin Raza Gilani while giving details said that in the initial phase, advanced metering infrastructure (AMI) meters are being installed in the Rawalpindi City and Rawalpindi cantt circles and so far 275000 AMI meters have been replaced with old electricity meters and hopefully by the end of the year 2026, 1.2 million old meters of Rawalpindi City and Rawalpindi cant circles will be replaced with AMI meters.

Mohsin Raza Gilani said that in the arrears of Korang, Swan, DHA 2, Chaklala, Chandi Chowk, F Block, Saham, Khayaban Sir Syed, Gangal, Fiaiza, Murree Road, PWD, National Police Foundation, Media Town areas AMI meters have been installed and it is hoped that the target of installation of 1.2 million AMI meters will be achieved within the stipulated period. He said the advance metering Infrastructure AMI meters will ensure Automatic meter reading, control of electricity theft, elimination of system overloading, reduction in burn incidents of transformers and meters and will also ensure timely registration and rectification of valuable IESCO customers’ complaints.

Copyright Business Recorder, 2024

Comments

Comments are closed for this article.