AGL 38.90 Decreased By ▼ -0.60 (-1.52%)
AIRLINK 194.29 Increased By ▲ 17.66 (10%)
BOP 10.85 Increased By ▲ 0.76 (7.53%)
CNERGY 6.95 Increased By ▲ 0.08 (1.16%)
DCL 9.74 Decreased By ▼ -0.19 (-1.91%)
DFML 43.45 Increased By ▲ 0.71 (1.66%)
DGKC 96.27 Decreased By ▼ -1.90 (-1.94%)
FCCL 38.28 Decreased By ▼ -1.03 (-2.62%)
FFBL 82.69 Increased By ▲ 0.83 (1.01%)
FFL 14.07 Decreased By ▼ -0.32 (-2.22%)
HUBC 119.40 Decreased By ▼ -2.04 (-1.68%)
HUMNL 14.94 Decreased By ▼ -0.40 (-2.61%)
KEL 5.79 Increased By ▲ 0.13 (2.3%)
KOSM 8.42 Increased By ▲ 0.30 (3.69%)
MLCF 46.90 Decreased By ▼ -1.21 (-2.52%)
NBP 76.50 Increased By ▲ 0.68 (0.9%)
OGDC 195.21 Decreased By ▼ -2.20 (-1.11%)
PAEL 35.00 Increased By ▲ 2.62 (8.09%)
PIBTL 8.25 Increased By ▲ 0.10 (1.23%)
PPL 173.89 Decreased By ▼ -1.61 (-0.92%)
PRL 33.12 Decreased By ▼ -0.97 (-2.85%)
PTC 24.57 Increased By ▲ 2.23 (9.98%)
SEARL 104.50 Increased By ▲ 1.30 (1.26%)
TELE 9.05 Increased By ▲ 0.54 (6.35%)
TOMCL 34.85 Decreased By ▼ -0.18 (-0.51%)
TPLP 11.16 Decreased By ▼ -0.10 (-0.89%)
TREET 18.75 Decreased By ▼ -0.40 (-2.09%)
TRG 60.43 Increased By ▲ 1.87 (3.19%)
UNITY 34.80 Decreased By ▼ -0.06 (-0.17%)
WTL 1.75 Increased By ▲ 0.16 (10.06%)
BR100 11,693 Increased By 41.8 (0.36%)
BR30 35,450 Decreased By -28 (-0.08%)
KSE100 108,945 Increased By 706.3 (0.65%)
KSE30 33,863 Increased By 169.4 (0.5%)

ISLAMABAD: The installation process of Advanced Metering Infrastructure (AMI) meters equipped with modern technology and modern requirements is going on rapidly in two operation circles of IESCO Rawalpindi City and Rawalpindi Cantt.

Project Director AMI Mohsin Raza Gilani while giving details said that in the initial phase, advanced metering infrastructure (AMI) meters are being installed in the Rawalpindi City and Rawalpindi cantt circles and so far 275000 AMI meters have been replaced with old electricity meters and hopefully by the end of the year 2026, 1.2 million old meters of Rawalpindi City and Rawalpindi cant circles will be replaced with AMI meters.

Mohsin Raza Gilani said that in the arrears of Korang, Swan, DHA 2, Chaklala, Chandi Chowk, F Block, Saham, Khayaban Sir Syed, Gangal, Fiaiza, Murree Road, PWD, National Police Foundation, Media Town areas AMI meters have been installed and it is hoped that the target of installation of 1.2 million AMI meters will be achieved within the stipulated period. He said the advance metering Infrastructure AMI meters will ensure Automatic meter reading, control of electricity theft, elimination of system overloading, reduction in burn incidents of transformers and meters and will also ensure timely registration and rectification of valuable IESCO customers’ complaints.

Copyright Business Recorder, 2024

Comments

Comments are closed.