BR100 Increased By (0.71%)
BR30 Increased By (0.54%)
KSE100 Increased By (0.67%)
KSE30 Increased By (0.7%)
AGHA 7.75 No Change ▼ 0.00 (0%)
BECO 5.20 Increased By ▲ 0.01 (0.19%)
BML 57.49 Decreased By ▼ -1.17 (-1.99%)
BOP 34.24 Increased By ▲ 0.55 (1.63%)
CNERGY 10.80 Increased By ▲ 0.19 (1.79%)
CSIL 5.43 Increased By ▲ 0.13 (2.45%)
FCCL 54.75 Increased By ▲ 1.01 (1.88%)
FFL 16.72 Increased By ▲ 0.26 (1.58%)
FNEL 1.23 Increased By ▲ 0.01 (0.82%)
KEL 7.42 Increased By ▲ 0.14 (1.92%)
KOSM 5.76 Increased By ▲ 0.12 (2.13%)
LOTCHEM 29.79 Increased By ▲ 0.14 (0.47%)
MLCF 95.85 Decreased By ▼ -0.51 (-0.53%)
NBP 204.05 Increased By ▲ 0.52 (0.26%)
NCPL 57.75 Increased By ▲ 0.90 (1.58%)
NPL 69.09 Increased By ▲ 1.78 (2.64%)
OGDC 318.30 Increased By ▲ 0.08 (0.03%)
PACE 10.83 Increased By ▲ 0.20 (1.88%)
PAEL 42.89 Increased By ▲ 1.12 (2.68%)
PIBTL 16.85 Increased By ▲ 0.04 (0.24%)
PPL 221.00 Increased By ▲ 0.83 (0.38%)
PRL 51.60 Increased By ▲ 2.55 (5.2%)
PTC 70.90 Increased By ▲ 0.89 (1.27%)
SSGC 28.43 Decreased By ▼ -0.71 (-2.44%)
TBL 9.95 Increased By ▲ 0.18 (1.84%)
TELE 8.90 Increased By ▲ 0.08 (0.91%)
TPL 18.05 Increased By ▲ 0.88 (5.13%)
TPLP 12.85 Increased By ▲ 0.34 (2.72%)
TREET 22.70 Increased By ▲ 0.11 (0.49%)
TRG 59.90 Decreased By ▼ -0.32 (-0.53%)

PESHAWAR: Secretary Energy and Power Nisar Ahmad Khan called foreign investment as a milestone in the coming days for the development of the energy sector in the province.

The senior official said that the natural resources of hydropower found in Khyber Pakhtunkhwa are a valuable treasure here, which if not utilized will only save the country from the current energy crisis and can be extracted, but the province will also get billions of rupees annually from energy projects.

He expressed these views regarding the progress of the 470 MW Lower Spat Gah Power Project in Kohistan district with the cooperation of KHNP, a state-owned company working in the energy sector of South Korea, and the Khyber Pakhtunkhwa government under the leadership of Wan Seok, Bae, the chief executive officer of the Korean engineering and construction company LSG Hydropower Ltd.

The project will be completed in 5 years, which is the largest in the history of the province. The meeting discussed the issues faced at the federal level with NEPRA including IGCEP Plan and NTDC.

Copyright Business Recorder, 2024

Comments

Comments are closed for this article.