BR100 Increased By (0.67%)
BR30 Increased By (0.83%)
KSE100 Increased By (0.43%)
KSE30 Increased By (0.44%)
BECO 6.10 Increased By ▲ 0.33 (5.72%)
BML 52.70 Decreased By ▼ -0.30 (-0.57%)
BOP 34.34 Increased By ▲ 0.35 (1.03%)
CNERGY 8.18 Increased By ▲ 0.07 (0.86%)
DCL 12.23 Increased By ▲ 0.03 (0.25%)
FCCL 53.20 Increased By ▲ 0.37 (0.7%)
FCSC 5.15 Increased By ▲ 0.08 (1.58%)
FFL 18.05 Increased By ▲ 0.10 (0.56%)
FNEL 1.32 Increased By ▲ 0.03 (2.33%)
HUMNL 10.90 Increased By ▲ 0.02 (0.18%)
KEL 8.14 Increased By ▲ 0.12 (1.5%)
KOSM 5.32 Decreased By ▼ -0.20 (-3.62%)
MLCF 87.00 Increased By ▲ 0.49 (0.57%)
NBP 187.15 Increased By ▲ 1.99 (1.07%)
PACE 10.67 Increased By ▲ 0.09 (0.85%)
PAEL 39.90 Increased By ▲ 0.48 (1.22%)
PIAHCLA 26.19 Decreased By ▼ -0.03 (-0.11%)
PIBTL 17.31 Increased By ▲ 0.64 (3.84%)
PPL 229.00 Increased By ▲ 0.82 (0.36%)
PRL 34.80 Increased By ▲ 0.12 (0.35%)
PTC 67.00 Increased By ▲ 1.67 (2.56%)
SEARL 90.77 Increased By ▲ 0.64 (0.71%)
SSGC 27.25 Increased By ▲ 0.65 (2.44%)
TELE 8.58 Increased By ▲ 0.30 (3.62%)
THCCL 58.22 Decreased By ▼ -0.28 (-0.48%)
TPLP 8.65 Increased By ▲ 0.43 (5.23%)
TREET 24.60 Increased By ▲ 0.07 (0.29%)
TRG 69.68 Decreased By ▼ -0.03 (-0.04%)
WAVES 9.99 Increased By ▲ 0.05 (0.5%)
WTL 1.29 Increased By ▲ 0.01 (0.78%)

PESHAWAR: Secretary Energy and Power Nisar Ahmad Khan called foreign investment as a milestone in the coming days for the development of the energy sector in the province.

The senior official said that the natural resources of hydropower found in Khyber Pakhtunkhwa are a valuable treasure here, which if not utilized will only save the country from the current energy crisis and can be extracted, but the province will also get billions of rupees annually from energy projects.

He expressed these views regarding the progress of the 470 MW Lower Spat Gah Power Project in Kohistan district with the cooperation of KHNP, a state-owned company working in the energy sector of South Korea, and the Khyber Pakhtunkhwa government under the leadership of Wan Seok, Bae, the chief executive officer of the Korean engineering and construction company LSG Hydropower Ltd.

The project will be completed in 5 years, which is the largest in the history of the province. The meeting discussed the issues faced at the federal level with NEPRA including IGCEP Plan and NTDC.

Copyright Business Recorder, 2024

Comments

Comments are closed for this article.