BR100 Increased By (0.2%)
BR30 Increased By (0.41%)
KSE100 Increased By (0.07%)
KSE30 Increased By (0.23%)
AGHA 7.75 Decreased By ▼ -0.17 (-2.15%)
BECO 5.19 Decreased By ▼ -0.01 (-0.19%)
BML 58.66 Decreased By ▼ -0.59 (-1%)
BOP 33.69 Increased By ▲ 0.01 (0.03%)
CNERGY 10.61 Increased By ▲ 0.80 (8.15%)
CSIL 5.30 Decreased By ▼ -0.12 (-2.21%)
FCCL 53.74 Increased By ▲ 0.22 (0.41%)
FFL 16.46 Decreased By ▼ -0.22 (-1.32%)
FNEL 1.22 Increased By ▲ 0.01 (0.83%)
KEL 7.28 Decreased By ▼ -0.07 (-0.95%)
KOSM 5.64 Increased By ▲ 0.03 (0.53%)
LOTCHEM 29.65 Increased By ▲ 0.54 (1.86%)
MLCF 96.36 Increased By ▲ 0.86 (0.9%)
NBP 203.53 Decreased By ▼ -0.82 (-0.4%)
NCPL 56.85 Decreased By ▼ -1.39 (-2.39%)
NPL 67.31 Decreased By ▼ -0.48 (-0.71%)
OGDC 318.22 Increased By ▲ 0.28 (0.09%)
PACE 10.63 Decreased By ▼ -0.08 (-0.75%)
PAEL 41.77 Decreased By ▼ -0.06 (-0.14%)
PIBTL 16.81 Increased By ▲ 0.31 (1.88%)
PPL 220.17 Increased By ▲ 0.43 (0.2%)
PRL 49.05 Increased By ▲ 4.46 (10%)
PTC 70.01 Decreased By ▼ -0.76 (-1.07%)
SSGC 29.14 Increased By ▲ 0.21 (0.73%)
TBL 9.77 Decreased By ▼ -0.07 (-0.71%)
TELE 8.82 Increased By ▲ 0.06 (0.68%)
TPL 17.17 Increased By ▲ 0.72 (4.38%)
TPLP 12.51 Increased By ▲ 0.41 (3.39%)
TREET 22.59 Decreased By ▼ -0.21 (-0.92%)
TRG 60.22 Increased By ▲ 0.19 (0.32%)

KARACHI: Pakistan Civil Aviation Authority (PCAA) is planning to commence the reconstruction of main runway (07L/25R) of Jinnah International Airport (JIAP) in the third week of current month.

For the purpose, PCAA has signed a contract for reconstruction of JIAP’s main runway (07L/25R) in a ceremony held at the PCAA Headquarters.

According to the PCAA, the reconstruction of main runway, starting soon after Eid, will enhance airside infrastructure bringing about significant advantages. The advantages include the ability to seamlessly accommodate wide body aircraft up to category 4F (including A380), improved safety, reliability, and the capacity to handle the growing passenger and aircraft traffic.

This upgrade is expected to attract both domestic and international airlines to operate at JIAP in the future. Upon completion of the upgrade, it will feature the latest energy-efficient LED CAT-I Airfield Lighting System with Runway Centreline Lights.

The upgrade project also includes extension of runway by 1000 feet making it 11500 feet. Reconstruction of taxiways and overruns at both ends, and asphaltic overlay of four taxi links near 07L end.

Copyright Business Recorder, 2024

Comments

Comments are closed for this article.