AIRLINK 74.56 Increased By ▲ 0.31 (0.42%)
BOP 5.04 Decreased By ▼ -0.01 (-0.2%)
CNERGY 4.51 Increased By ▲ 0.09 (2.04%)
DFML 37.77 Increased By ▲ 1.93 (5.39%)
DGKC 90.97 Increased By ▲ 2.97 (3.38%)
FCCL 22.60 Increased By ▲ 0.40 (1.8%)
FFBL 32.66 Decreased By ▼ -0.06 (-0.18%)
FFL 9.75 Decreased By ▼ -0.04 (-0.41%)
GGL 10.98 Increased By ▲ 0.18 (1.67%)
HBL 115.90 No Change ▼ 0.00 (0%)
HUBC 136.25 Increased By ▲ 0.41 (0.3%)
HUMNL 10.15 Increased By ▲ 0.31 (3.15%)
KEL 4.62 Increased By ▲ 0.01 (0.22%)
KOSM 5.06 Increased By ▲ 0.40 (8.58%)
MLCF 40.41 Increased By ▲ 0.53 (1.33%)
OGDC 138.00 Increased By ▲ 0.10 (0.07%)
PAEL 27.62 Increased By ▲ 1.19 (4.5%)
PIAA 24.49 Decreased By ▼ -1.79 (-6.81%)
PIBTL 6.74 Decreased By ▼ -0.02 (-0.3%)
PPL 123.10 Increased By ▲ 0.20 (0.16%)
PRL 27.02 Increased By ▲ 0.33 (1.24%)
PTC 14.05 Increased By ▲ 0.05 (0.36%)
SEARL 58.86 Increased By ▲ 0.16 (0.27%)
SNGP 70.19 Decreased By ▼ -0.21 (-0.3%)
SSGC 10.37 Increased By ▲ 0.01 (0.1%)
TELE 8.58 Increased By ▲ 0.02 (0.23%)
TPLP 11.20 Decreased By ▼ -0.18 (-1.58%)
TRG 64.62 Increased By ▲ 0.39 (0.61%)
UNITY 26.55 Increased By ▲ 0.50 (1.92%)
WTL 1.40 Increased By ▲ 0.02 (1.45%)
BR100 7,858 Increased By 19.6 (0.25%)
BR30 25,581 Increased By 121.1 (0.48%)
KSE100 75,195 Increased By 264.2 (0.35%)
KSE30 24,177 Increased By 31.4 (0.13%)

ISLAMABAD: Pakistan Railways is spending Rs1862.84 million for the rehabilitation of 518 kilometres of track between Kotri-Khanpur under the project of Immediate Track Safety Works (ITSW-I).

Despite financial constraints, the management of Pakistan Railways is putting maximum efforts into improvement in infrastructure including tracks, bridges, stations etc, an official in the Ministry of Railways told APP.

Under the project of rehabilitation of Karachi Port tracks, 24-kilometer tracks, 17 level crossings and seven bridges have been rehabilitated along with the replacement of turnouts. The official said that Railway Dry Ports at Lahore (Mughalpura), Badami Bagh and Azakhel have been upgraded.

He said under the Immediate Track Safety Works (ITS W-II & IMTS W-III), the railway track between Tando Adam-Khanpur covering 456 kilometers would be rehabilitated at a cost of Rs 4830.437 million and Rs 4875.461 million respectively by replacing the US components of the track by ensuring the safety of train operation.

A PC-I amounting to Rs 4930.22 million for the rehabilitation of track machinery has been approved which would ensure quality of track maintenance work.

Meanwhile, 11 stations have been upgraded including Peshawar, Hassan Abdal, Rawalpindi, Gujranwala, Lahore, Narowal, Nankana Sahib, Raiwind, Okara, Sahiwal, and Bahawalpur, under PSDP projects.

“The project of upgradation of Main Line-I at a cost of $6.683 billion has been negotiated with the Chinese side for completing the ML-1 in two phases consisting of four packages,” he added.

About the assets of Pakistan Railways are mainly related to the track (11881 kilometres), rolling stock (15699), etc and most of these assets have lived their useful life. He said, “The department has taken several measures for efficient maintenance of these assets which included an increase in fiscal space for maintenance through transfer of pension, reduce utility bills through solarisation, improving procurement management through prioritized procurement and an efficient fuel management system.”

He said, “The department is gradually shifting from manual to a mechanized track maintenance regime for enhanced productivity and quality while improved governance of the maintenance system through the introduction of IT-related interventions (ERP, etc) and provision of professional human resources are also among the top priorities.”

“Regional Connectivity is an important aspect of the Pakistan Railway development framework. Presently, Pakistan Railway has planned to improve its functional links with regional countries including India and Iran,” he added.

Comments

Comments are closed.