BR100 Increased By (0.24%)
BR30 Increased By (0.4%)
KSE100 Increased By (0.31%)
KSE30 Increased By (0.01%)
AGHA 7.44 No Change ▼ 0.00 (0%)
BECO 5.30 Increased By ▲ 0.22 (4.33%)
BML 57.06 Decreased By ▼ -0.52 (-0.9%)
BOP 33.49 Increased By ▲ 0.10 (0.3%)
CNERGY 10.74 Increased By ▲ 0.13 (1.23%)
CSIL 6.04 Increased By ▲ 0.62 (11.44%)
FCCL 54.18 Increased By ▲ 0.12 (0.22%)
FFL 16.07 No Change ▼ 0.00 (0%)
FNEL 1.22 Increased By ▲ 0.02 (1.67%)
KEL 7.18 Decreased By ▼ -0.01 (-0.14%)
KOSM 5.93 Decreased By ▼ -0.03 (-0.5%)
LOTCHEM 26.97 Decreased By ▼ -0.16 (-0.59%)
MLCF 94.87 Decreased By ▼ -0.72 (-0.75%)
NBP 200.29 Increased By ▲ 0.03 (0.01%)
NCPL 55.47 Decreased By ▼ -0.21 (-0.38%)
NPL 65.62 Decreased By ▼ -0.23 (-0.35%)
OGDC 314.04 Increased By ▲ 0.04 (0.01%)
PACE 10.51 Increased By ▲ 0.01 (0.1%)
PAEL 42.27 Increased By ▲ 0.15 (0.36%)
PIBTL 17.04 Increased By ▲ 0.03 (0.18%)
PPL 216.21 Increased By ▲ 1.06 (0.49%)
PRL 60.14 Increased By ▲ 3.51 (6.2%)
PTC 72.01 Increased By ▲ 0.63 (0.88%)
SSGC 25.28 Increased By ▲ 0.10 (0.4%)
TBL 9.67 No Change ▼ 0.00 (0%)
TELE 8.25 Decreased By ▼ -0.06 (-0.72%)
TPL 20.33 Increased By ▲ 1.15 (6%)
TPLP 13.37 Increased By ▲ 0.64 (5.03%)
TREET 23.05 Decreased By ▼ -0.28 (-1.2%)
TRG 60.85 Decreased By ▼ -0.95 (-1.54%)

KARACHI: President of SITE Association of Industry (SAI) Riazuddin has condemned the suspension of gas supply to the industries and their Captive Power Plants (CPPs), and requested the federal and provincial governments to take notice of the grave situation created by the Sui Southern Gas Company (SSGC) in the present difficult times.

Supply of gas to the industries/ CPPs is critical to ensure provision of clean and uninterrupted energy to industries, said Riazuddin.

He elaborated that fluctuations in electricity or interruptions therein not only result in production losses but inflict a severe damage of control panels and of sophisticated power drives, rendering them irreparable in the prevailing situation due to restriction on import of machinery and spares.

While expressing deep concern over the gas supply situation to industries in SITE, President SAI termed the enduring suspension of gas to Karachi based industries, even after the arrival of summer is absolutely unfair, discriminatory and a wrongful act which is highly uncalled for.

He appealed the government to issue strict directives for urgent resumption of gas supply with ample pressure and 24/7 continuity to all industries and their CPPs else the industrialists will be forced to close down their production units on this count alone.

Copyright Business Recorder, 2023

Comments

Comments are closed for this article.