BR100 Increased By (1.32%)
BR30 Increased By (1.33%)
KSE100 Increased By (1.25%)
KSE30 Increased By (1.31%)
AGHA 7.87 Increased By ▲ 0.12 (1.55%)
BECO 5.22 Increased By ▲ 0.03 (0.58%)
BML 59.00 Increased By ▲ 0.34 (0.58%)
BOP 34.30 Increased By ▲ 0.61 (1.81%)
CNERGY 10.93 Increased By ▲ 0.32 (3.02%)
CSIL 5.30 No Change ▼ 0.00 (0%)
FCCL 54.31 Increased By ▲ 0.57 (1.06%)
FFL 16.83 Increased By ▲ 0.37 (2.25%)
FNEL 1.23 Increased By ▲ 0.01 (0.82%)
KEL 7.45 Increased By ▲ 0.17 (2.34%)
KOSM 5.72 Increased By ▲ 0.08 (1.42%)
LOTCHEM 30.05 Increased By ▲ 0.40 (1.35%)
MLCF 97.29 Increased By ▲ 0.93 (0.97%)
NBP 206.15 Increased By ▲ 2.62 (1.29%)
NCPL 57.87 Increased By ▲ 1.02 (1.79%)
NPL 68.87 Increased By ▲ 1.56 (2.32%)
OGDC 321.40 Increased By ▲ 3.18 (1%)
PACE 10.80 Increased By ▲ 0.17 (1.6%)
PAEL 42.45 Increased By ▲ 0.68 (1.63%)
PIBTL 17.00 Increased By ▲ 0.19 (1.13%)
PPL 223.67 Increased By ▲ 3.50 (1.59%)
PRL 52.89 Increased By ▲ 3.84 (7.83%)
PTC 71.00 Increased By ▲ 0.99 (1.41%)
SSGC 29.60 Increased By ▲ 0.46 (1.58%)
TBL 9.82 Increased By ▲ 0.05 (0.51%)
TELE 8.94 Increased By ▲ 0.12 (1.36%)
TPL 17.30 Increased By ▲ 0.13 (0.76%)
TPLP 12.77 Increased By ▲ 0.26 (2.08%)
TREET 22.89 Increased By ▲ 0.30 (1.33%)
TRG 60.00 Decreased By ▼ -0.22 (-0.37%)

KARACHI: Pak Sarzameen Party (PSP) Chairman Syed Mustafa Kamal on Sunday said that if Karachi gives mandate to PSP, it will ensure immediate supply of 640 million cusecs of water by completely dismantling hydrant mafia.

Simultaneously, PSP will complete mega water project K-IV and start work on K-V.

He expressed these views while addressing a public meeting in Baldia Town.

In 2008, “I had handed over the land to the Karachi Water Board for water line projects for up to 50 years of Karachi’s needs, and kicked-off K-IV project,” he claimed.

Kamal released a road map to ensure the supply of drinking water to Karachi.

He further said that when the population of Karachi was 20 million, 1200 million cusecs of water was required. But, now 1500 million cusecs of water is required for more than 30 million population.

K-IV has not been completed till date by PPP because of its incompetence and bias.

When projects are not completed on time their costs continue to rise, which directly impact our economy. Unfortunately our so called leaders lack national approach. Due to their narrow mindedness, the landlords of the People’s Party have destroyed the province of Sindh and caused irreparable damage to the country economically.

During my regime as City Nazim, no one dared to build hydrants on water lines. Still only we can shut down the hydrants on the water lines.

We are the only doctors of this city and it’s only us who know how to fix economic hub of Pakistan.

Copyright Business Recorder, 2022

Comments

Comments are closed for this article.