BR100 Decreased By (-0.67%)
BR30 Decreased By (-0.45%)
KSE100 Decreased By (-0.59%)
KSE30 Decreased By (-0.71%)
AGHA 7.71 Decreased By ▼ -0.10 (-1.28%)
BECO 5.17 Decreased By ▼ -0.04 (-0.77%)
BML 57.50 No Change ▼ 0.00 (0%)
BOP 34.16 Increased By ▲ 0.13 (0.38%)
CNERGY 10.06 Increased By ▲ 0.10 (1%)
CSIL 5.30 Decreased By ▼ -0.01 (-0.19%)
FCCL 53.99 Decreased By ▼ -0.71 (-1.3%)
FFL 16.56 Decreased By ▼ -0.13 (-0.78%)
FNEL 1.22 Decreased By ▼ -0.01 (-0.81%)
KEL 7.26 Decreased By ▼ -0.14 (-1.89%)
KOSM 5.73 Decreased By ▼ -0.04 (-0.69%)
LOTCHEM 29.20 Decreased By ▼ -0.12 (-0.41%)
MLCF 92.35 Decreased By ▼ -2.01 (-2.13%)
NBP 202.30 Decreased By ▼ -0.75 (-0.37%)
NCPL 56.70 Decreased By ▼ -0.30 (-0.53%)
NPL 66.90 Decreased By ▼ -0.80 (-1.18%)
OGDC 314.25 Decreased By ▼ -1.59 (-0.5%)
PACE 10.59 Decreased By ▼ -0.05 (-0.47%)
PAEL 42.60 Decreased By ▼ -0.60 (-1.39%)
PIBTL 16.60 Decreased By ▼ -0.14 (-0.84%)
PPL 218.20 Decreased By ▼ -1.58 (-0.72%)
PRL 51.20 Increased By ▲ 2.01 (4.09%)
PTC 70.39 Decreased By ▼ -0.14 (-0.2%)
SSGC 27.33 Decreased By ▼ -0.92 (-3.26%)
TBL 9.79 Decreased By ▼ -0.07 (-0.71%)
TELE 8.67 Decreased By ▼ -0.12 (-1.37%)
TPL 18.30 Increased By ▲ 0.06 (0.33%)
TPLP 13.51 Increased By ▲ 0.24 (1.81%)
TREET 22.59 Decreased By ▼ -0.13 (-0.57%)
TRG 59.91 Decreased By ▼ -0.23 (-0.38%)

KARACHI: In order to observe and ensure the effective implementation of safety standards along the entire railways’ infrastructure, divisional superintendent of the Pakistan Railways, Karachi, Muhammad Hanif Gul, inspected the ML-1 track and installations on motor trolley from Gaddar to Kotri on Wednesday.

Inspection on motor trolley is considered to be the most intrusive of all the inspections conducted in the inspection regime of the Pakistan Railways as a crystal clear picture of track appears before the inspecting officers.

The 125-kilometer inspection from Gaddar to Kotri stations entailed visit of seven en route stations also: Dhabeji, Ran Pathani, Jungshahi, Braudabad, Jhimpir, Meting and Bholari.

While meeting the deputed officials at various stations, the divisional superintendent directed them for taking every necessary action and leaving no stone unturned for routinely conducting safe and smooth Up/ Down train operations.

Copyright Business Recorder, 2021

Comments

Comments are closed for this article.