BR100 Decreased By (-0.4%)
BR30 Decreased By (-0.65%)
KSE100 Decreased By (-0.29%)
KSE30 Decreased By (-0.22%)
AGHA 6.56 Decreased By ▼ -0.11 (-1.65%)
BECO 4.40 Increased By ▲ 0.05 (1.15%)
BML 55.89 Decreased By ▼ -0.28 (-0.5%)
BOP 30.05 Decreased By ▼ -0.07 (-0.23%)
CNERGY 12.75 Decreased By ▼ -0.23 (-1.77%)
CSIL 5.21 Decreased By ▼ -0.10 (-1.88%)
FCCL 51.00 Decreased By ▼ -0.65 (-1.26%)
FFL 14.43 Decreased By ▼ -0.06 (-0.41%)
FNEL 1.22 Increased By ▲ 0.01 (0.83%)
KEL 5.97 Decreased By ▼ -0.09 (-1.49%)
KOSM 5.58 Decreased By ▼ -0.26 (-4.45%)
LOTCHEM 26.15 Decreased By ▼ -0.02 (-0.08%)
MLCF 90.33 Decreased By ▼ -0.90 (-0.99%)
NBP 161.45 Decreased By ▼ -2.74 (-1.67%)
NCPL 52.55 Decreased By ▼ -0.63 (-1.18%)
NPL 57.98 Decreased By ▼ -1.14 (-1.93%)
OGDC 315.40 Increased By ▲ 2.01 (0.64%)
PACE 9.70 Decreased By ▼ -0.07 (-0.72%)
PAEL 34.73 Decreased By ▼ -0.51 (-1.45%)
PIBTL 14.23 Decreased By ▼ -0.48 (-3.26%)
PPL 221.00 Decreased By ▼ -0.36 (-0.16%)
PRL 90.89 Decreased By ▼ -0.33 (-0.36%)
PTC 59.25 Increased By ▲ 0.06 (0.1%)
SSGC 23.39 Increased By ▲ 0.09 (0.39%)
TBL 8.65 Decreased By ▼ -0.10 (-1.14%)
TELE 7.40 Decreased By ▼ -0.21 (-2.76%)
TPL 21.00 Decreased By ▼ -1.03 (-4.68%)
TPLP 12.02 Decreased By ▼ -0.54 (-4.3%)
TREET 21.33 Decreased By ▼ -0.40 (-1.84%)
TRG 54.35 Decreased By ▼ -1.44 (-2.58%)
Pakistan

2915 MW added to national grid system in last 3 years

Published Updated

imageISLAMABAD: As many as some 2915.30 MW electricity has been added to the National grid system since 2013.

Official sources told APP here that the said quantum of energy was added to the system from 25 small projects which were completed during the last three years.

However, they said that several projects based on different sources included hydel, wind, solar and coal etc were in progress and would be completed by the year 2017-18.

Giving the break up of projects which were completed during the last three years, the sources said five hydel projects including New Bong Escape (84 MW), Allai Khwar (121 MW), Jinnah (96 MW), Gomal Zam (17.40 MW) and Dubair Khwar (130 MW) were commissioned during the said period.

Similarly, they said eight wind projects namely FFCEL (49.50 MW), ZEPL (56.40 MW), TGF (49.50 MW), FFEL-II (50 MW), FFEL-I (50 MW), Sapphire (52.80 MW), Metro and Younus each (50 MW). The four solar projects included Quaid-e-Azam (100 MW) , Apolo (100 MW), Best Green (100 MW) and Crest Energy (50 MW).

Similarly, 747 MW from Guddu and 425 MW, 380 MW from Uch-II and 62 MW from Chiniot Power (Bagasse) were added to the system during the last three years.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed for this article.